Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Univ. of Kansas |
---|---|
Assessment Year | 1987 |
Principal Product | BALL BEARINGS |
NAICS | n/a |
SIC | 3562 - Ball And Roller Bearings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 245 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 35,000,000 Pieces |
Production Hrs. Annual | 5,688 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $484,117 | 10,810,961 | kWh | $0.04 |
Natural Gas | $88,018 | 25,330 | MMBtu | $3.47 |
TOTAL ENERGY COSTS | $572,135 | |||
RECOMMENDED SAVINGS* | $26,245 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,830 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4312 IMPROVE LUBRICATION PRACTICES |
Savings: $11,769 Cost: - |
$11,769 | 262,896 | - | - | - | - |
$11,769 262,896 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $3,844 Cost: - |
$3,844 | 85,873 | - | - | - | - |
$3,844 85,873 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $3,582 Cost: $400 |
$3,582 | 80,012 | - | - | - | - |
$3,582 80,012 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $2,242 Cost: $4,000 |
- | - | $2,242 | 646 | - | - |
- - kWh |
$2,242 646 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,629 Cost: - |
- | - | $1,829 | 527 | $(-200) | - |
- - kWh |
$1,829 527 MMBtu |
$(-200) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $935 Cost: $1,800 |
$1,299 | 29,015 | $(-364) | (-105) | - | - |
$1,299 29,015 kWh |
$(-364) (-105) MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1123 INSTALL AUTOMATIC STACK DAMPER |
Savings: $784 Cost: $1,275 |
- | - | $784 | 226 | - | - |
- - kWh |
$784 226 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $524 Cost: - |
- | - | $684 | 197 | $(-160) | - |
- - kWh |
$684 197 MMBtu |
$(-160) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $643 Cost: $150 |
$643 | 14,361 | - | - | - | - |
$643 14,361 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT |
Savings: $162 Cost: - |
- | - | $222 | 64 | $(-60) | - |
- - kWh |
$222 64 MMBtu |
$(-60) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $131 Cost: $50 |
$131 | 2,931 | - | - | - | - |
$131 2,931 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $26,245 Cost: $7,675 |
$21,268 | 475,088 | $5,397 | 1,555 | $(-420) | - | $21,268 475,088 kWh |
$5,397 1,555 MMBtu |
$(-420) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,830 Cost: $4,400 |
$7,426 | 165,885 | $2,464 | 710 | $(-60) | - | $7,426 165,885 kWh |
$2,464 710 MMBtu |
$(-60) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |