Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Univ. of Kansas |
---|---|
Assessment Year | 1988 |
Principal Product | LUBRICATION DEVICES |
NAICS | n/a |
SIC | 3569 - General Industrial Machinery, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 60 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 20,000 Pounds |
Production Hrs. Annual | 2,000 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $33,556 | 655,627 | kWh | $0.05 |
Natural Gas | $6,522 | 1,853 | MMBtu | $3.52 |
Other Energy | $10,831 | 1,574 | MMBtu | $6.88 |
TOTAL ENERGY COSTS | $50,909 | |||
RECOMMENDED SAVINGS* | $10,867 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,933 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Energy | Administrative Changes | Electricity Usage | Natural Gas | Other Energy | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $1,275 Cost: $227 |
$1,275 | 24,912 | - | - | - | - | - | - |
$1,275 24,912 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $7,290 Cost: - |
$(-1,425) | (-27,843) | $493 | 140 | - | - | $8,222 | - |
$(-1,425) (-27,843) kWh |
$493 140 MMBtu |
- - MMBtu |
$8,222 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $495 Cost: $215 |
$555 | 10,844 | $(-60) | (-17) | - | - | - | - |
$555 10,844 kWh |
$(-60) (-17) MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $390 Cost: $120 |
$390 | 7,620 | - | - | - | - | - | - |
$390 7,620 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $330 Cost: $30 |
$330 | 6,448 | - | - | - | - | - | - |
$330 6,448 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.8223 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE |
Savings: $323 Cost: - |
- | - | - | - | $323 | 47 | - | - |
- - kWh |
- - MMBtu |
$323 47 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED |
Savings: $285 Cost: - |
$285 | 5,569 | - | - | - | - | - | - |
$285 5,569 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $225 Cost: $150 |
- | - | $225 | 64 | - | - | - | - |
- - kWh |
$225 64 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $149 Cost: $160 |
$15 | 293 | $134 | 38 | - | - | - | - |
$15 293 kWh |
$134 38 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $105 Cost: - |
$105 | 2,052 | - | - | - | - | - | - |
$105 2,052 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $10,867 Cost: $902 |
$1,530 | 29,895 | $792 | 225 | $323 | 47 | $8,222 | - | $1,530 29,895 kWh |
$792 225 MMBtu |
$323 47 MMBtu |
$8,222 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,933 Cost: $527 |
$2,385 | 46,601 | $225 | 64 | $323 | 47 | - | - | $2,385 46,601 kWh |
$225 64 MMBtu |
$323 47 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Energy | Administrative Changes | Electricity Usage | Natural Gas | Other Energy | Administrative Changes |