IAC Assessment: KU0265
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0265
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1988
Principal Product PASTA
NAICS n/a
SIC 2098 - Macaroni And Spaghetti
Sales $10,000,000-$50,000,000
# of Employees 145
Plant Area (Sq.Ft.) 0
Annual Production 70,000,000 Pounds
Production Hrs. Annual 7,200
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $325,734 7,274,912 kWh $0.04
Natural Gas $98,380 36,351 MMBtu $2.71
TOTAL ENERGY COSTS $424,114
RECOMMENDED SAVINGS* $34,152 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,672
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$2,309
Cost:
$2,400
$2,309 51,583 - - - - $2,309
51,583
kWh
-
-
MMBtu
-
-
$
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,548
Cost:
$400
$1,548 34,584 - - - - $1,548
34,584
kWh
-
-
MMBtu
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,892
Cost:
$5,000
- - $2,892 1,067 - - -
-
kWh
$2,892
1,067
MMBtu
-
-
$
04: 2.1222 INSTALL TURBULATORS Savings:
$2,263
Cost:
$1,250
- - $2,263 835 - - -
-
kWh
$2,263
835
MMBtu
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$771
Cost:
-
- - $921 340 $(-150) - -
-
kWh
$921
340
MMBtu
$(-150)
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$606
Cost:
$700
$(-39) (-879) $645 238 - - $(-39)
(-879)
kWh
$645
238
MMBtu
-
-
$
07: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$1,623
Cost:
$4,500
$(-404) (-9,086) $2,027 748 - - $(-404)
(-9,086)
kWh
$2,027
748
MMBtu
-
-
$
08: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$4,120
Cost:
-
$4,120 92,028 - - - - $4,120
92,028
kWh
-
-
MMBtu
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,325
Cost:
-
$1,325 29,601 - - - - $1,325
29,601
kWh
-
-
MMBtu
-
-
$
10: 3.4151 MINIMIZE WATER USAGE Savings:
$9,368
Cost:
$6,400
$(-118) (-2,638) $68 25 $9,418 - $(-118)
(-2,638)
kWh
$68
25
MMBtu
$9,418
-
$
11: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$7,327
Cost:
$6,400
- - - - $7,327 - -
-
kWh
-
-
MMBtu
$7,327
-
$
TOTAL RECOMMENDED Savings:
$34,152
Cost:
$27,050
$8,741 195,193 $8,816 3,253 $16,595 - $8,741
195,193
kWh
$8,816
3,253
MMBtu
$16,595
-
$
TOTAL IMPLEMENTED Savings:
$28,672
Cost:
$19,750
$5,288 118,112 $6,789 2,505 $16,595 - $5,288
118,112
kWh
$6,789
2,505
MMBtu
$16,595
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes