IAC Assessment: KU0322
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0322
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1990
Principal Product ASPHALT MIXTURES
NAICS n/a
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $5,000,000-$10,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 10,000 Thousand Gallons
Production Hrs. Annual 7,200
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $52,286 516,120 kWh $0.10
Natural Gas $90,703 29,220 MMBtu $3.10
Fuel Oil #2 $43,905 5,642 MMBtu $7.78
TOTAL ENERGY COSTS $186,894
RECOMMENDED SAVINGS* $28,261 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,202
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$9,059
Cost:
$10,000
- - $9,059 3,759 - - -
-
kWh
$9,059
3,759
MMBtu
-
-
MMBtu
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$16,055
Cost:
$4,500
- - - - $16,055 2,061 -
-
kWh
-
-
MMBtu
$16,055
2,061
MMBtu
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$653
Cost:
$250
$653 6,448 - - - - $653
6,448
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,494
Cost:
$900
$2,494 24,619 - - - - $2,494
24,619
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$28,261
Cost:
$15,650
$3,147 31,067 $9,059 3,759 $16,055 2,061 $3,147
31,067
kWh
$9,059
3,759
MMBtu
$16,055
2,061
MMBtu
TOTAL IMPLEMENTED Savings:
$19,202
Cost:
$5,650
$3,147 31,067 - - $16,055 2,061 $3,147
31,067
kWh
-
-
MMBtu
$16,055
2,061
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2