IAC Assessment: KU0335
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0335
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1991
Principal Product COOKWARE & WATER FILTERS
NAICS n/a
SIC 3469 - Metal Stampings, Nec
Sales $10,000,000-$50,000,000
# of Employees 78
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 4,788
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $111,227 1,679,074 kWh $0.07
Natural Gas $6,608 1,457 MMBtu $4.54
TOTAL ENERGY COSTS $117,835
RECOMMENDED SAVINGS* $21,927 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,927
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$6,716
Cost:
-
$9,608 145,076 $(-2,892) (-637) - - $9,608
145,076
kWh
$(-2,892)
(-637)
MMBtu
-
-
$
02: 2.2532 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD Savings:
$6,430
Cost:
-
$3,416 51,583 $2,384 525 $630 - $3,416
51,583
kWh
$2,384
525
MMBtu
$630
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$4,755
Cost:
$1,500
$4,755 71,805 - - - - $4,755
71,805
kWh
-
-
MMBtu
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,018
Cost:
-
$2,633 - $(-615) - - - $2,633
-
kWh
$(-615)
-
MMBtu
-
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$641
Cost:
$300
$641 9,672 - - - - $641
9,672
kWh
-
-
MMBtu
-
-
$
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$590
Cost:
-
$427 6,448 $163 36 - - $427
6,448
kWh
$163
36
MMBtu
-
-
$
07: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$369
Cost:
$300
$369 5,569 - - - - $369
5,569
kWh
-
-
MMBtu
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$408
Cost:
$388
$408 6,155 - - - - $408
6,155
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$21,927
Cost:
$2,488
$22,257 296,308 $(-960) (-76) $630 - $22,257
296,308
kWh
$(-960)
(-76)
MMBtu
$630
-
$
TOTAL IMPLEMENTED Savings:
$21,927
Cost:
$2,488
$22,257 296,308 $(-960) (-76) $630 - $22,257
296,308
kWh
$(-960)
(-76)
MMBtu
$630
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes