IAC logo
IAC Assessment: KU0337
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0337
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1991
Principal Product CORRUGATED PAPER BOARD
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 0
Annual Production 358 Thousand Feet
Production Hrs. Annual 6,000
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $164,161 3,184,349 kWh $0.05
Natural Gas $68,346 30,952 MMBtu $2.21
TOTAL ENERGY COSTS $232,507
RECOMMENDED SAVINGS* $40,127 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
02: 2.2532 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD Savings:
$14,145
Cost:
$14,500
$10,260 199,004 $3,885 1,982 $10,260
199,004
kWh
$3,885
1,982
MMBtu
03: 2.2532 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD Savings:
$11,166
Cost:
$14,400
$5,905 114,596 $5,261 2,684 $5,905
114,596
kWh
$5,261
2,684
MMBtu
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$6,059
Cost:
$3,000
$6,059 117,526 - - $6,059
117,526
kWh
-
-
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,175
Cost:
$1,725
- - $3,175 1,620 -
-
kWh
$3,175
1,620
MMBtu
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,279
Cost:
$5,000
- - $2,279 1,163 -
-
kWh
$2,279
1,163
MMBtu
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,499
Cost:
$4,200
- - $1,499 765 -
-
kWh
$1,499
765
MMBtu
09: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$657
Cost:
$1,000
- - $657 335 -
-
kWh
$657
335
MMBtu
10: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$633
Cost:
$300
- - $633 323 -
-
kWh
$633
323
MMBtu
11: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$514
Cost:
$100
$514 9,965 - - $514
9,965
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$40,127
Cost:
$44,225
$22,738 441,091 $17,389 8,872 $22,738
441,091
kWh
$17,389
8,872
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas