IAC logo
IAC Assessment: KU0341
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0341
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1991
Principal Product METAL BUILDINGS
NAICS n/a
SIC 3448 - Prefabricated Metal Buildings
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 30,000 Tons
Production Hrs. Annual 6,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $147,903 3,147,421 kWh $0.05
Natural Gas $42,194 9,521 MMBtu $4.43
TOTAL ENERGY COSTS $190,097
RECOMMENDED SAVINGS* $23,365 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,057
Cost:
$600
- - $2,057 464 -
-
kWh
$2,057
464
MMBtu
02: 2.2532 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD Savings:
$3,592
Cost:
$400
$744 15,826 $2,848 643 $744
15,826
kWh
$2,848
643
MMBtu
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$3,117
Cost:
$950
$565 12,016 $2,552 576 $565
12,016
kWh
$2,552
576
MMBtu
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,453
Cost:
$9,300
$5,453 116,061 - - $5,453
116,061
kWh
-
-
MMBtu
05: 2.7441 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH Savings:
$1,435
Cost:
$800
- - $1,435 324 -
-
kWh
$1,435
324
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,048
Cost:
$570
$4,048 86,166 - - $4,048
86,166
kWh
-
-
MMBtu
07: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$2,561
Cost:
$1,975
$2,561 54,513 - - $2,561
54,513
kWh
-
-
MMBtu
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,102
Cost:
$800
$1,102 23,447 - - $1,102
23,447
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$23,365
Cost:
$15,395
$14,473 308,029 $8,892 2,007 $14,473
308,029
kWh
$8,892
2,007
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas