IAC Assessment: KU0365
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0365
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1992
Principal Product EARTH MOVERS ATTACHMENTS
NAICS n/a
SIC 3531 - Construction Machinery
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 0
Annual Production 2,500 Tons
Production Hrs. Annual 4,940
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $143,309 2,644,490 kWh $0.05
Natural Gas $30,146 9,774 MMBtu $3.08
TOTAL ENERGY COSTS $173,455
RECOMMENDED SAVINGS* $24,702 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,733
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2532 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD Savings:
$13,442
Cost:
-
$2,938 54,220 $4,069 1,321 $6,435 - $2,938
54,220
kWh
$4,069
1,321
MMBtu
$6,435
-
$
02: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$6,266
Cost:
$31,766
$(-492) (-9,086) $6,758 2,194 - - $(-492)
(-9,086)
kWh
$6,758
2,194
MMBtu
-
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,768
Cost:
$887
$524 9,672 $1,244 404 - - $524
9,672
kWh
$1,244
404
MMBtu
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$873
Cost:
$870
$873 16,120 - - - - $873
16,120
kWh
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,302
Cost:
$540
$1,302 24,033 - - - - $1,302
24,033
kWh
-
-
MMBtu
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$400
Cost:
$900
- - $400 130 - - -
-
kWh
$400
130
MMBtu
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$397
Cost:
$250
$397 7,327 - - - - $397
7,327
kWh
-
-
MMBtu
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$254
Cost:
$160
$254 4,689 - - - - $254
4,689
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$24,702
Cost:
$35,373
$5,796 106,975 $12,471 4,049 $6,435 - $5,796
106,975
kWh
$12,471
4,049
MMBtu
$6,435
-
$
TOTAL IMPLEMENTED Savings:
$9,733
Cost:
$33,443
$1,731 31,946 $8,002 2,598 - - $1,731
31,946
kWh
$8,002
2,598
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes