IAC logo
IAC Assessment: KU0374
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0374
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1992
Principal Product FLEXIBLE PACKAGING
NAICS n/a
SIC 2673 - Bags: Plastics, Laminated, & Coated
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 0
Annual Production 3,600,000 Pounds
Production Hrs. Annual 6,240
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $57,810 942,263 kWh $0.06
Natural Gas $8,759 2,037 MMBtu $4.30
TOTAL ENERGY COSTS $66,569
RECOMMENDED SAVINGS* $12,317 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,730
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$4,932
Cost:
$3,705
- - $4,932 1,147 -
-
kWh
$4,932
1,147
MMBtu
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,477
Cost:
-
$2,176 35,463 $301 70 $2,176
35,463
kWh
$301
70
MMBtu
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,925
Cost:
$4,800
$(-234) (-3,810) $2,159 502 $(-234)
(-3,810)
kWh
$2,159
502
MMBtu
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,651
Cost:
$1,785
- - $1,651 384 -
-
kWh
$1,651
384
MMBtu
05: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$602
Cost:
$1,066
- - $602 140 -
-
kWh
$602
140
MMBtu
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$403
Cost:
-
$575 9,379 $(-172) (-40) $575
9,379
kWh
$(-172)
(-40)
MMBtu
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$327
Cost:
-
- - $327 76 -
-
kWh
$327
76
MMBtu
TOTAL RECOMMENDED Savings:
$12,317
Cost:
$11,356
$2,517 41,032 $9,800 2,279 $2,517
41,032
kWh
$9,800
2,279
MMBtu
TOTAL IMPLEMENTED Savings:
$4,730
Cost:
$2,851
$2,176 35,463 $2,554 594 $2,176
35,463
kWh
$2,554
594
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas