IAC logo
IAC Assessment: KU0467
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0467
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1996
Principal Product Telescoping and Articulating Cranes
NAICS n/a
SIC 3591 -
Sales $50,000,000-$100,000,000
# of Employees 370
Plant Area (Sq.Ft.) 221,520
Annual Production 1,200 Pieces
Production Hrs. Annual 6,720
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $130,134 6,751,172 kWh $0.02
Electricity Demand $150,967 15,310 kW-months/year $9.86
Natural Gas $78,091 29,225 MMBtu $2.67
TOTAL ENERGY COSTS $376,472
RECOMMENDED SAVINGS* $45,303 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $37,233
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ $ $ $ $ $
01: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$23,485
Cost:
$6,060
$(-755) (-14,654) - - $12,096 3,696 $(-2,640) - - - $14,784 - $(-755)
(-14,654)
kWh
-
-
kW-months/year
$12,096
3,696
gal
$(-2,640)
-
$
-
-
$
$14,784
-
$
02: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$8,070
Cost:
$2,075
- - - - $(-2,850) (-950) $(-1,080) - $12,000 - - - -
-
kWh
-
-
kW-months/year
$(-2,850)
(-950)
gal
$(-1,080)
-
$
$12,000
-
$
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,367
Cost:
$7,650
- - $4,367 - - - - - - - - - -
-
kWh
$4,367
-
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,980
Cost:
$236
$1,998 112,837 $1,982 201 - - - - - - - - $1,998
112,837
kWh
$1,982
201
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,938
Cost:
$556
$1,473 83,236 $1,465 149 - - - - - - - - $1,473
83,236
kWh
$1,465
149
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,642
Cost:
$1,500
$601 33,998 $1,041 106 - - - - - - - - $601
33,998
kWh
$1,041
106
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$821
Cost:
$299
$342 19,343 $345 35 - - - - - - $134 - $342
19,343
kWh
$345
35
kW-months/year
-
-
gal
-
-
$
-
-
$
$134
-
$
TOTAL RECOMMENDED Savings:
$45,303
Cost:
$18,376
$3,659 234,760 $9,200 491 $9,246 2,746 $(-3,720) - $12,000 - $14,918 - $3,659
234,760
kWh
$9,200
491
kW-months/year
$9,246
2,746
gal
$(-3,720)
-
$
$12,000
-
$
$14,918
-
$
TOTAL IMPLEMENTED Savings:
$37,233
Cost:
$16,301
$3,659 234,760 $9,200 491 $12,096 3,696 $(-2,640) - - - $14,918 - $3,659
234,760
kWh
$9,200
491
kW-months/year
$12,096
3,696
gal
$(-2,640)
-
$
-
-
$
$14,918
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes Ancillary Material Cost