Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Univ. of Kansas |
---|---|
Assessment Year | 1998 |
Principal Product | Plastic bottles |
NAICS | n/a |
SIC | 3085 - Plastics Bottles |
Sales | $10,000,000-$50,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 73,250 |
Annual Production | 24,000,000 Pounds |
Production Hrs. Annual | 8,712 |
Location (State) | KS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $416,583 | 12,311,841 | kWh | $0.03 |
Electricity Demand | $114,954 | 22,893 | kW-months/year | $5.02 |
Natural Gas | $17,045 | 2,868 | MMBtu | $5.94 |
TOTAL ENERGY COSTS | $598,215 | |||
RECOMMENDED SAVINGS* | $287,190 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $216,090 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Primary Raw Material | Increase in Production | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Primary Raw Material | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $7,850 Cost: $5,030 |
$6,220 | 208,089 | $1,630 | 343 | - | - | - | - | - | - | - | - |
$6,220 208,089 kWh |
$1,630 343 kW-months/year |
- - gal |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $6,900 Cost: $7,180 |
$6,900 | 230,657 | - | - | - | - | - | - | - | - | - | - |
$6,900 230,657 kWh |
- - kW-months/year |
- - gal |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $470 Cost: $350 |
$470 | 15,533 | - | - | - | - | - | - | - | - | - | - |
$470 15,533 kWh |
- - kW-months/year |
- - gal |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $440 Cost: $100 |
$360 | 12,309 | $80 | 17 | - | - | - | - | - | - | - | - |
$360 12,309 kWh |
$80 17 kW-months/year |
- - gal |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES |
Savings: $530 Cost: $1,500 |
$(-80) | (-2,638) | $(-30) | (-7) | $1,280 | 218 | - | - | $(-640) | - | - | - |
$(-80) (-2,638) kWh |
$(-30) (-7) kW-months/year |
$1,280 218 gal |
- - $ |
$(-640) - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $200,430 Cost: $152,790 |
$28,770 | 962,192 | $6,300 | 1,325 | - | - | - | - | - | - | $165,360 | - |
$28,770 962,192 kWh |
$6,300 1,325 kW-months/year |
- - gal |
- - $ |
- - $ |
$165,360 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $70,570 Cost: $158,000 |
- | - | - | - | - | - | $70,570 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
$70,570 - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $287,190 Cost: $324,950 |
$42,640 | 1,426,142 | $7,980 | 1,678 | $1,280 | 218 | $70,570 | - | $(-640) | - | $165,360 | - | $42,640 1,426,142 kWh |
$7,980 1,678 kW-months/year |
$1,280 218 gal |
$70,570 - $ |
$(-640) - $ |
$165,360 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $216,090 Cost: $165,450 |
$42,720 | 1,428,780 | $8,010 | 1,685 | - | - | - | - | - | - | $165,360 | - | $42,720 1,428,780 kWh |
$8,010 1,685 kW-months/year |
- - gal |
- - $ |
- - $ |
$165,360 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Primary Raw Material | Increase in Production | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Primary Raw Material | Increase in Production |