Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Univ. of Kansas |
---|---|
Assessment Year | 1999 |
Principal Product | carbonated beverages |
NAICS | n/a |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | $50,000,000-$100,000,000 |
# of Employees | 115 |
Plant Area (Sq.Ft.) | 216,000 |
Annual Production | 36,000,000 Pieces |
Production Hrs. Annual | 4,964 |
Location (State) | KS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $407,016 | 7,369,578 | kWh | $0.06 |
Electricity Demand | $92,379 | 17,759 | kW-months/year | $5.20 |
Natural Gas | $161,592 | 40,840 | MMBtu | $3.96 |
TOTAL ENERGY COSTS | $916,622 | |||
RECOMMENDED SAVINGS* | $158,630 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $147,970 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2211 USE OPTIMUM TEMPERATURE |
Savings: $25,150 Cost: $9,360 |
- | - | - | - | $25,150 | 6,350 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$25,150 6,350 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $4,760 Cost: $13,490 |
- | - | - | - | $4,760 | 1,202 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,760 1,202 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7291 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS |
Savings: $2,250 Cost: $280 |
- | - | - | - | $2,250 | 567 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,250 567 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,950 Cost: $3,040 |
$1,070 | 35,463 | $880 | 86 | - | - | - | - | - | - | - | - |
$1,070 35,463 kWh |
$880 86 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,300 Cost: $1,960 |
- | - | - | - | $1,300 | 328 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,300 328 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,120 Cost: $860 |
- | - | $500 | 49 | $620 | 70 | - | - | - | - | - | - |
- - kWh |
$500 49 kW-months/year |
$620 70 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4151 MINIMIZE WATER USAGE |
Savings: $12,240 Cost: $22,300 |
- | - | - | - | - | - | $12,240 | 4,976,400 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$12,240 4,976,400 Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $2,650 Cost: $480 |
- | - | - | - | - | - | - | - | $2,650 | 68,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$2,650 68,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $490 Cost: $260 |
- | - | - | - | - | - | $490 | 197,500 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$490 197,500 Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $106,720 Cost: $288,000 |
- | - | - | - | - | - | - | - | - | - | $106,720 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$106,720 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $158,630 Cost: $340,030 |
$1,070 | 35,463 | $1,380 | 135 | $34,080 | 8,517 | $12,730 | 5,173,900 | $2,650 | 68,000 | $106,720 | - | $1,070 35,463 kWh |
$1,380 135 kW-months/year |
$34,080 8,517 MMBtu |
$12,730 5,173,900 Tgal |
$2,650 68,000 lb |
$106,720 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $147,970 Cost: $321,060 |
- | - | $500 | 49 | $28,020 | 6,987 | $12,730 | 5,173,900 | - | - | $106,720 | - | - - kWh |
$500 49 kW-months/year |
$28,020 6,987 MMBtu |
$12,730 5,173,900 Tgal |
- - lb |
$106,720 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes |