Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Univ. of Kansas |
---|---|
Assessment Year | 1999 |
Principal Product | structural steel |
NAICS | n/a |
SIC | 3441 - Fabricated Structural Metal |
Sales | $5,000,000-$10,000,000 |
# of Employees | 95 |
Plant Area (Sq.Ft.) | 290,000 |
Annual Production | 15,000 Tons |
Production Hrs. Annual | 3,120 |
Location (State) | KS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $73,437 | 1,912,368 | kWh | $0.04 |
Electricity Demand | $37,563 | 11,582 | kW-months/year | $3.24 |
Natural Gas | $45,208 | 10,139 | MMBtu | $4.46 |
TOTAL ENERGY COSTS | $160,208 | |||
RECOMMENDED SAVINGS* | $19,910 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Liquid (haz) | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $7,490 Cost: $7,600 |
- | - | - | - | - | - | $7,490 | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
$7,490 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,040 Cost: $2,050 |
$3,000 | 82,356 | $1,040 | 317 | - | - | - | - | - | - |
$3,000 82,356 kWh |
$1,040 317 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $2,100 Cost: $560 |
$1,260 | 34,584 | $840 | 254 | - | - | - | - | - | - |
$1,260 34,584 kWh |
$840 254 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $800 Cost: $1,530 |
$480 | 13,189 | $170 | 50 | - | - | - | - | $150 | - |
$480 13,189 kWh |
$170 50 kW-months/year |
- - gal |
- - $ |
$150 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $740 Cost: $450 |
$550 | 15,240 | $190 | 59 | - | - | - | - | - | - |
$550 15,240 kWh |
$190 59 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE |
Savings: $4,740 Cost: $6,300 |
$(-130) | (-3,810) | $(-170) | (-50) | $1,790 | 620 | - | - | $3,250 | - |
$(-130) (-3,810) kWh |
$(-170) (-50) kW-months/year |
$1,790 620 gal |
- - $ |
$3,250 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $19,910 Cost: $18,490 |
$5,160 | 141,559 | $2,070 | 630 | $1,790 | 620 | $7,490 | - | $3,400 | - | $5,160 141,559 kWh |
$2,070 630 kW-months/year |
$1,790 620 gal |
$7,490 - $ |
$3,400 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Liquid (haz) | Administrative Changes | Ancillary Material Cost |