Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Univ. of Kansas |
---|---|
Assessment Year | 1999 |
Principal Product | baggage carts, cargo dollies |
NAICS | n/a |
SIC | 3535 - Conveyors And Conveying Equipment |
Sales | $5,000,000-$10,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 55,000 |
Annual Production | 4,200 Pieces |
Production Hrs. Annual | 6,084 |
Location (State) | NE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $30,606 | 786,049 | kWh | $0.04 |
Electricity Demand | $3,288 | 1,315 | kW-months/year | $2.50 |
Natural Gas | $27,948 | 5,044 | MMBtu | $5.54 |
TOTAL ENERGY COSTS | $97,213 | |||
RECOMMENDED SAVINGS* | $189,680 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $58,040 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $1,050 Cost: $80 |
$950 | 28,722 | $100 | 38 | - | - | - | - | - | - |
$950 28,722 kWh |
$100 38 kW-months/year |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $540 Cost: $490 |
$470 | 14,361 | $70 | 29 | - | - | - | - | - | - |
$470 14,361 kWh |
$70 29 kW-months/year |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $290 Cost: $80 |
$250 | 7,327 | $40 | 15 | - | - | - | - | - | - |
$250 7,327 kWh |
$40 15 kW-months/year |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $16,440 Cost: $53,740 |
- | - | - | - | $(-3,510) | - | $19,950 | - | - | - |
- - kWh |
- - kW-months/year |
$(-3,510) - $ |
$19,950 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $115,200 Cost: $60,680 |
- | - | - | - | - | - | - | - | $115,200 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - $ |
$115,200 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.446 AUTOMATE FINISHING PROCESS |
Savings: $56,160 Cost: $92,600 |
- | - | - | - | $56,160 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$56,160 - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $189,680 Cost: $207,670 |
$1,670 | 50,410 | $210 | 82 | $52,650 | - | $19,950 | - | $115,200 | - | $1,670 50,410 kWh |
$210 82 kW-months/year |
$52,650 - $ |
$19,950 - $ |
$115,200 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $58,040 Cost: $93,250 |
$1,670 | 50,410 | $210 | 82 | $56,160 | - | - | - | - | - | $1,670 50,410 kWh |
$210 82 kW-months/year |
$56,160 - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Increase in Production |