IAC logo
IAC Assessment: KU0530
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0530
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1999
Principal Product wood windows
NAICS n/a
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 140,800
Annual Production 47,500 Pieces
Production Hrs. Annual 2,100
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $30,758 1,070,926 kWh $0.03
Electricity Demand $36,814 4,826 kW-months/year $7.63
Natural Gas $29,584 6,383 MMBtu $4.63
TOTAL ENERGY COSTS $74,245
RECOMMENDED SAVINGS* $75,110 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$6,910
Cost:
$8,800
$1,980 86,166 $4,930 547 - - - - - - $1,980
86,166
kWh
$4,930
547
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$900
Cost:
$520
$290 12,603 $610 68 - - - - - - $290
12,603
kWh
$610
68
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$620
Cost:
$730
- - - - $620 133 - - - - -
-
kWh
-
-
kW-months/year
$620
133
MMBtu
-
-
$
-
-
$
04: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$55,080
Cost:
$1,380
- - - - - - $55,080 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$55,080
-
$
-
-
$
05: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$11,600
Cost:
$10,670
- - - - - - - - $11,600 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$11,600
-
$
TOTAL RECOMMENDED Savings:
$75,110
Cost:
$22,100
$2,270 98,769 $5,540 615 $620 133 $55,080 - $11,600 - $2,270
98,769
kWh
$5,540
615
kW-months/year
$620
133
MMBtu
$55,080
-
$
$11,600
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product