IAC logo
IAC Assessment: KU0546
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0546
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 2000
Principal Product canned pet food
NAICS n/a
SIC 2047 - Dog And Cat Food
Sales $100,000,000-$500,000,000
# of Employees 342
Plant Area (Sq.Ft.) 450,000
Annual Production 263,000 Tons
Production Hrs. Annual 5,832
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $361,271 20,119,274 kWh $0.02
Electricity Demand $446,320 40,838 kW-months/year $10.93
Electricity Fees $18,255 - $ -
Natural Gas $718,703 302,283 MMBtu $2.38
TOTAL ENERGY COSTS $1,195,549
RECOMMENDED SAVINGS* $526,940 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,370
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST Savings:
$431,791
Cost:
$2,400,000
$335,405 18,393,904 $414,110 37,850 $(-317,724) (-133,510) - - $335,405
18,393,904
kWh
$414,110
37,850
kW-months/year
$(-317,724)
(-133,510)
MMBtu
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$74,779
Cost:
$244,140
$20,799 1,136,578 $23,010 2,923 - - $30,970 - $20,799
1,136,578
kWh
$23,010
2,923
kW-months/year
-
-
MMBtu
$30,970
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$17,000
Cost:
$9,570
- - $17,000 - - - - - -
-
kWh
$17,000
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,500
Cost:
$1,000
- - - - $2,500 1,075 - - -
-
kWh
-
-
kW-months/year
$2,500
1,075
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$870
Cost:
$740
- - - - $870 367 - - -
-
kWh
-
-
kW-months/year
$870
367
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$526,940
Cost:
$2,655,450
$356,204 19,530,482 $454,120 40,773 $(-314,354) (-132,068) $30,970 - $356,204
19,530,482
kWh
$454,120
40,773
kW-months/year
$(-314,354)
(-132,068)
MMBtu
$30,970
-
$
TOTAL IMPLEMENTED Savings:
$3,370
Cost:
$1,740
- - - - $3,370 1,442 - - -
-
kWh
-
-
kW-months/year
$3,370
1,442
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost