IAC Assessment: KU0548
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0548
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 2000
Principal Product electrical metering equipment
NAICS n/a
SIC 3825 - Instruments To Measure Electricity
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 108,800
Annual Production 432,000 Units
Production Hrs. Annual 4,500
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $123,116 2,810,906 kWh $0.04
Electricity Demand $35,839 8,299 kW-months/year $4.32
Electricity Fees $23,433 - $ -
Natural Gas $81,214 14,516 MMBtu $5.59
TOTAL ENERGY COSTS $158,197
RECOMMENDED SAVINGS* $33,135 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ Tgal
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$13,917
Cost:
-
- - - - - - - - - - $13,917 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$13,917
-
$
-
-
Tgal
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$6,154
Cost:
$11,500
$4,211 107,562 $1,943 224 - - - - - - - - - - $4,211
107,562
kWh
$1,943
224
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,963
Cost:
$1,505
- - - - $3,963 709 - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,963
709
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,604
Cost:
$40
$1,496 38,101 $1,108 128 - - - - - - - - - - $1,496
38,101
kWh
$1,108
128
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,422
Cost:
$1,050
$1,284 32,532 $1,138 131 - - - - - - - - - - $1,284
32,532
kWh
$1,138
131
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
06: 3.4151 MINIMIZE WATER USAGE Savings:
$4,075
Cost:
$4,075
- - - - $2,845 509 $1,698 130,650 $(-2,400) - - - $1,932 - -
-
kWh
-
-
kW-months/year
$2,845
509
MMBtu
$1,698
130,650
Tgal
$(-2,400)
-
$
-
-
$
$1,932
-
Tgal
TOTAL RECOMMENDED Savings:
$33,135
Cost:
$18,170
$6,991 178,195 $4,189 483 $6,808 1,218 $1,698 130,650 $(-2,400) - $13,917 - $1,932 - $6,991
178,195
kWh
$4,189
483
kW-months/year
$6,808
1,218
MMBtu
$1,698
130,650
Tgal
$(-2,400)
-
$
$13,917
-
$
$1,932
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Water Consumption