IAC Assessment: KU0552
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0552
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 2000
Principal Product magnetic conveyors and equipment
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 198
Plant Area (Sq.Ft.) 43,200
Annual Production 1,000 Tons
Production Hrs. Annual 6,000
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,662 1,287,040 kWh $0.04
Electricity Demand $41,843 3,643 kW-months/year $11.49
Electricity Fees $1,253 - $ -
Natural Gas $7,660 1,207 MMBtu $6.35
TOTAL ENERGY COSTS $95,258
RECOMMENDED SAVINGS* $17,292 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Primary Raw Material
$ kWh $ kW-months/year $ $ $ lb $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$900
Cost:
$600
$552 15,240 $348 31 - - - - - - $552
15,240
kWh
$348
31
kW-months/year
-
-
$
-
-
lb
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$699
Cost:
$725
- - - - $699 - - - - - -
-
kWh
-
-
kW-months/year
$699
-
$
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$378
Cost:
$206
$232 6,448 $146 13 - - - - - - $232
6,448
kWh
$146
13
kW-months/year
-
-
$
-
-
lb
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$3,315
Cost:
$6,000
- - - - - - $3,315 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,315
-
lb
-
-
$
05: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$12,000
Cost:
$11,400
- - - - - - $(-6,000) 60,000 $18,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$(-6,000)
60,000
lb
$18,000
-
$
TOTAL RECOMMENDED Savings:
$17,292
Cost:
$18,931
$784 21,688 $494 44 $699 - $(-2,685) 60,000 $18,000 - $784
21,688
kWh
$494
44
kW-months/year
$699
-
$
$(-2,685)
60,000
lb
$18,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Primary Raw Material