IAC Assessment: LE0147
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0147
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2002
Principal Product Precision Cylindrical Grinders
NAICS n/a
SIC 3541 - Machine Tools, Metal Cutting Types
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 100 Pieces
Production Hrs. Annual 2,040
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $513,532 10,687,691 kWh $0.05
Electricity Demand $268,576 28,917 kW-months/year $9.29
Natural Gas $76,165 48,715 MMBtu $1.56
TOTAL ENERGY COSTS $858,273
RECOMMENDED SAVINGS* $70,303 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,084
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,429
Cost:
$900
$7,107 310,270 $4,322 465 - - - - $7,107
310,270
kWh
$4,322
465
kW-months/year
-
-
$
-
-
MMBtu
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$6,177
Cost:
$4,200
- - - - - - $6,177 3,952 -
-
kWh
-
-
kW-months/year
-
-
$
$6,177
3,952
MMBtu
03: 2.8112 COMBINE UTILITY METERS Savings:
$30,000
Cost:
$1,000
- - - - $30,000 - - - -
-
kWh
-
-
kW-months/year
$30,000
-
$
-
-
MMBtu
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,478
Cost:
$750
- - - - - - $1,478 947 -
-
kWh
-
-
kW-months/year
-
-
$
$1,478
947
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,219
Cost:
$13,000
- - - - - - $2,219 1,422 -
-
kWh
-
-
kW-months/year
-
-
$
$2,219
1,422
MMBtu
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$19,000
Cost:
$38,000
$19,000 829,694 - - - - - - $19,000
829,694
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$70,303
Cost:
$57,850
$26,107 1,139,964 $4,322 465 $30,000 - $9,874 6,321 $26,107
1,139,964
kWh
$4,322
465
kW-months/year
$30,000
-
$
$9,874
6,321
MMBtu
TOTAL IMPLEMENTED Savings:
$19,084
Cost:
$5,850
$7,107 310,270 $4,322 465 - - $7,655 4,899 $7,107
310,270
kWh
$4,322
465
kW-months/year
-
-
$
$7,655
4,899
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas