Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2002 |
Principal Product | Wall Covering - Pool Liner - Window Shades |
NAICS | n/a |
SIC | 2754 - Commercial Printing, Gravure |
Sales | $10,000,000-$50,000,000 |
# of Employees | 140 |
Plant Area (Sq.Ft.) | 66,035 |
Annual Production | 0 Units |
Production Hrs. Annual | 5,760 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $222,944 | 2,044,422 | kWh | $0.11 |
Electricity Demand | $59,618 | 6,338 | kW-months/year | $9.41 |
Natural Gas | $167,956 | 26,606 | MMBtu | $6.31 |
TOTAL ENERGY COSTS | $450,518 | |||
RECOMMENDED SAVINGS* | $53,057 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $32,013 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $4,655 Cost: $340 |
$3,901 | 48,764 | $754 | 80 | - | - |
$3,901 48,764 kWh |
$754 80 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $7,182 Cost: $1,000 |
$5,488 | 68,600 | $1,694 | 180 | - | - |
$5,488 68,600 kWh |
$1,694 180 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,441 Cost: $260 |
- | - | - | - | $1,441 | 229 |
- - kWh |
- - kW-months/year |
$1,441 229 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,547 Cost: $1,200 |
- | - | - | - | $1,547 | 245 |
- - kWh |
- - kW-months/year |
$1,547 245 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $11,578 Cost: $25,000 |
- | - | - | - | $11,578 | 1,835 |
- - kWh |
- - kW-months/year |
$11,578 1,835 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $886 Cost: $750 |
- | - | - | - | $886 | 140 |
- - kWh |
- - kW-months/year |
$886 140 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $472 Cost: $75 |
$472 | 5,910 | - | - | - | - |
$472 5,910 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $4,252 Cost: $2,100 |
$4,252 | 53,155 | - | - | - | - |
$4,252 53,155 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR |
Savings: $21,044 Cost: $10,000 |
- | - | - | - | $21,044 | 3,335 |
- - kWh |
- - kW-months/year |
$21,044 3,335 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $53,057 Cost: $40,725 |
$14,113 | 176,429 | $2,448 | 260 | $36,496 | 5,784 | $14,113 176,429 kWh |
$2,448 260 kW-months/year |
$36,496 5,784 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $32,013 Cost: $30,725 |
$14,113 | 176,429 | $2,448 | 260 | $15,452 | 2,449 | $14,113 176,429 kWh |
$2,448 260 kW-months/year |
$15,452 2,449 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |