Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2003 |
Principal Product | Men's Suit |
NAICS | 315210 - Cut and Sew Apparel Contractors |
SIC | 2311 - Men's and Boys' Suits, Coats, and Overcoats |
Sales | $10,000,000-$50,000,000 |
# of Employees | 324 |
Plant Area (Sq.Ft.) | 103,925 |
Annual Production | 139,000 Pieces |
Production Hrs. Annual | 2,592 |
Location (State) | MD |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $180,324 | 2,378,334 | kWh | $0.08 |
Electricity Demand | $114,170 | 9,994 | kW-months/year | $11.42 |
Natural Gas | $84,290 | 13,496 | MMBtu | $6.25 |
TOTAL ENERGY COSTS | $378,784 | |||
RECOMMENDED SAVINGS* | $41,478 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $11,879 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7131 ADD AREA LIGHTING SWITCHES |
Savings: $3,181 Cost: $1,375 |
$1,537 | 55,296 | $1,644 | 144 | - | - | - | - |
$1,537 55,296 kWh |
$1,644 144 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT |
Savings: $4,007 Cost: $4,000 |
- | - | - | - | $4,007 | 465 | - | - |
- - kWh |
- - kW-months/year |
$4,007 465 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $19,979 Cost: $7,500 |
$6,345 | 278,572 | $13,634 | 1,194 | - | - | - | - |
$6,345 278,572 kWh |
$13,634 1,194 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $2,432 Cost: $1,500 |
- | - | - | - | $2,432 | 395 | - | - |
- - kWh |
- - kW-months/year |
$2,432 395 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $4,189 Cost: $750 |
- | - | - | - | $4,189 | 680 | - | - |
- - kWh |
- - kW-months/year |
$4,189 680 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE |
Savings: $4,948 Cost: $1,000 |
$1,187 | 42,690 | $3,761 | 329 | - | - | - | - |
$1,187 42,690 kWh |
$3,761 329 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $766 Cost: $75 |
$263 | 9,400 | $503 | 44 | - | - | - | - |
$263 9,400 kWh |
$503 44 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $1,976 Cost: $877 |
$472 | 16,848 | $962 | 94 | - | - | $542 | - |
$472 16,848 kWh |
$962 94 kW-months/year |
- - MMBtu |
$542 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $41,478 Cost: $17,077 |
$9,804 | 402,806 | $20,504 | 1,805 | $10,628 | 1,540 | $542 | - | $9,804 402,806 kWh |
$20,504 1,805 kW-months/year |
$10,628 1,540 MMBtu |
$542 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $11,879 Cost: $2,702 |
$1,922 | 68,938 | $5,226 | 467 | $4,189 | 680 | $542 | - | $1,922 68,938 kWh |
$5,226 467 kW-months/year |
$4,189 680 MMBtu |
$542 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost |