Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2003 |
Principal Product | Powdered Metals, Alloys, Minerals and Chemicals |
NAICS | 331221 - Rolled Steel Shape Manufacturing |
SIC | 3399 - Primary Metal Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 40 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 12,000 Tons |
Production Hrs. Annual | 4,160 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $150,693 | 2,071,200 | kWh | $0.07 |
Electricity Demand | $79,061 | 6,572 | kW-months/year | $12.03 |
Natural Gas | $80,770 | 9,839 | MMBtu | $8.21 |
TOTAL ENERGY COSTS | $310,524 | |||
RECOMMENDED SAVINGS* | $21,188 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,438 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $8,970 Cost: $1,440 |
- | - | - | - | $8,970 | 1,092 | - | - |
- - kWh |
- - kW-months/year |
$8,970 1,092 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,288 Cost: $500 |
$2,288 | 31,425 | - | - | - | - | - | - |
$2,288 31,425 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $5,356 Cost: $263 |
$4,027 | 47,861 | $1,329 | 110 | - | - | - | - |
$4,027 47,861 kWh |
$1,329 110 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $468 Cost: - |
- | - | - | - | - | - | $468 | 44 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$468 44 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $498 Cost: - |
$498 | 6,845 | - | - | - | - | - | - |
$498 6,845 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2312 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS |
Savings: $3,608 Cost: $500 |
- | - | - | - | $3,608 | 440 | - | - |
- - kWh |
- - kW-months/year |
$3,608 440 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $21,188 Cost: $2,703 |
$6,813 | 86,131 | $1,329 | 110 | $12,578 | 1,532 | $468 | 44 | $6,813 86,131 kWh |
$1,329 110 kW-months/year |
$12,578 1,532 MMBtu |
$468 44 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,438 Cost: $1,440 |
- | - | - | - | $8,970 | 1,092 | $468 | 44 | - - kWh |
- - kW-months/year |
$8,970 1,092 MMBtu |
$468 44 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 |