IAC logo
IAC Assessment: LE0206
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0206
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2005
Principal Product Urethane Foam
NAICS 337121 - Upholstered Household Furniture Manufacturing
SIC 3086 - Plastics Foam Products
Sales $10,000,000-$50,000,000
# of Employees 62
Plant Area (Sq.Ft.) 79,000
Annual Production 1,000,000 Thousand Feet
Production Hrs. Annual 2,080
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $68,974 1,946,484 kWh $0.04
Electricity Demand $59,301 9,592 kW-months/year $6.18
Natural Gas $67,343 8,211 MMBtu $8.20
TOTAL ENERGY COSTS $195,618
RECOMMENDED SAVINGS* $255,585 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,756
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$135,669
Cost:
$50,000
- - - - - - $135,669 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$135,669
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$31,193
Cost:
$5,000
- - - - $31,193 3,804 - - -
-
kWh
-
-
kW-months/year
$31,193
3,804
MMBtu
-
-
$
03: 4.651 INSTALL BACK-UP EQUIPMENT Savings:
$11,880
Cost:
$14,100
$9,566 273,312 $2,314 31 - - - - $9,566
273,312
kWh
$2,314
31
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$8,905
Cost:
$2,500
- - - - $8,905 1,086 - - -
-
kWh
-
-
kW-months/year
$8,905
1,086
MMBtu
-
-
$
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$3,894
Cost:
$2,200
$496 14,175 $505 82 $2,893 353 - - $496
14,175
kWh
$505
82
kW-months/year
$2,893
353
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$683
Cost:
$200
$338 9,669 $345 56 - - - - $338
9,669
kWh
$345
56
kW-months/year
-
-
MMBtu
-
-
$
07: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$63,361
Cost:
$382,500
$17,636 503,880 $18,911 3,060 $26,814 3,270 - - $17,636
503,880
kWh
$18,911
3,060
kW-months/year
$26,814
3,270
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$255,585
Cost:
$456,500
$28,036 801,036 $22,075 3,229 $69,805 8,513 $135,669 - $28,036
801,036
kWh
$22,075
3,229
kW-months/year
$69,805
8,513
MMBtu
$135,669
-
$
TOTAL IMPLEMENTED Savings:
$43,756
Cost:
$19,300
$9,904 282,981 $2,659 87 $31,193 3,804 - - $9,904
282,981
kWh
$2,659
87
kW-months/year
$31,193
3,804
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product