IAC logo
IAC Assessment: LE0227
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0227
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2006
Principal Product folding cartons
NAICS 322212 - Folding Paperboard Box Manufacturing
SIC 2657 - Folding Paperboard Boxes
Sales <$500,000
# of Employees 77
Plant Area (Sq.Ft.) 102,000
Annual Production 10,358,815 Units
Production Hrs. Annual 4,000
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $164,168 1,539,600 kWh $0.11
Electricity Demand $40,274 6,690 kW-months/year $6.02
Natural Gas $55,767 4,919 MMBtu $11.34
TOTAL ENERGY COSTS $260,209
RECOMMENDED SAVINGS* $190,970 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$101,579
Cost:
$40,000
$86,910 812,246 $14,669 2,436 - - - - $86,910
812,246
kWh
$14,669
2,436
kW-months/year
-
-
MMBtu
-
-
$
02: 2.1224 REPLACE BOILER Savings:
$39,147
Cost:
$143,000
- - - - $39,147 3,015 - - -
-
kWh
-
-
kW-months/year
$39,147
3,015
MMBtu
-
-
$
03: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$18,895
Cost:
$42,000
- - $18,895 262 - - - - -
-
kWh
$18,895
262
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,727
Cost:
$1,000
$13,457 125,726 $2,270 377 - - - - $13,457
125,726
kWh
$2,270
377
kW-months/year
-
-
MMBtu
-
-
$
05: 4.6510 INSTALL BACK-UP EQUIPMENT Savings:
$8,000
Cost:
$7,900
- - - - - - $8,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8,000
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,005
Cost:
$500
$4,415 41,271 $590 98 - - - - $4,415
41,271
kWh
$590
98
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,617
Cost:
$1,200
- - - - $2,617 231 - - -
-
kWh
-
-
kW-months/year
$2,617
231
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$190,970
Cost:
$235,600
$104,782 979,243 $36,424 3,173 $41,764 3,246 $8,000 - $104,782
979,243
kWh
$36,424
3,173
kW-months/year
$41,764
3,246
MMBtu
$8,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost