IAC logo
IAC Assessment: LE0241
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0241
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2006
Principal Product crushed stone and ashphalt
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 8,712,000
Annual Production 1,042,900 Tons
Production Hrs. Annual 2,400
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $718,648 5,226,000 kWh $0.14
Electricity Demand $19,370 22,411 kW-months/year $0.86
Natural Gas $979,862 86,275 MMBtu $11.36
TOTAL ENERGY COSTS $1,717,880
RECOMMENDED SAVINGS* $462,354 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$306,494
Cost:
$200,000
- - - - - - $306,494 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$306,494
-
MMBtu
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$61,625
Cost:
$80,000
$31,653 226,090 $972 1,130 $24,000 - - - $5,000 - $31,653
226,090
kWh
$972
1,130
kW-months/year
$24,000
-
$
-
-
MMBtu
$5,000
-
$
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$47,697
Cost:
$40,000
$7,697 54,976 - - - - - - $40,000 - $7,697
54,976
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$40,000
-
$
04: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$24,673
Cost:
$12,500
$23,812 170,088 $861 1,000 - - - - - - $23,812
170,088
kWh
$861
1,000
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$10,395
Cost:
$2,500
$10,085 72,037 $310 360 - - - - - - $10,085
72,037
kWh
$310
360
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$9,629
Cost:
$12,033
- - - - - - $9,629 848 - - -
-
kWh
-
-
kW-months/year
-
-
$
$9,629
848
MMBtu
-
-
$
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,841
Cost:
$500
$1,786 12,757 $55 64 - - - - - - $1,786
12,757
kWh
$55
64
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$462,354
Cost:
$347,533
$75,033 535,948 $2,198 2,554 $24,000 - $316,123 848 $45,000 - $75,033
535,948
kWh
$2,198
2,554
kW-months/year
$24,000
-
$
$316,123
848
MMBtu
$45,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost