IAC Assessment: LE0264
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0264
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2007
Principal Product Thermoplastic Compounds
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 3087 - Custom Compound Purchased Resins
Sales $10,000,000-$50,000,000
# of Employees 86
Plant Area (Sq.Ft.) 194,447
Annual Production 1,700 Tons
Production Hrs. Annual 8,736
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $560,464 7,112,361 kWh $0.08
Electricity Demand $106,612 16,529 kW-months/year $6.45
Natural Gas $113,894 6,989 MMBtu $16.30
TOTAL ENERGY COSTS $780,970
RECOMMENDED SAVINGS* $65,678 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,543
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Increase in Production Electricity Usage Electricity Demand Natural Gas Increase in Production
$ kWh $ kW-months/year $ MMBtu $ %
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$25,680
Cost:
$50,000
- - - - - - $25,680 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$25,680
-
%
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,103
Cost:
$2,500
$9,046 114,525 $1,057 164 - - - - $9,046
114,525
kWh
$1,057
164
kW-months/year
-
-
MMBtu
-
-
%
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,204
Cost:
$2,000
- - - - $4,204 258 - - -
-
kWh
-
-
kW-months/year
$4,204
258
MMBtu
-
-
%
04: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$4,727
Cost:
$2,250
$4,233 53,587 $494 77 - - - - $4,233
53,587
kWh
$494
77
kW-months/year
-
-
MMBtu
-
-
%
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,084
Cost:
$500
$3,564 45,118 $520 81 - - - - $3,564
45,118
kWh
$520
81
kW-months/year
-
-
MMBtu
-
-
%
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,514
Cost:
$200
$3,147 39,831 $367 57 - - - - $3,147
39,831
kWh
$367
57
kW-months/year
-
-
MMBtu
-
-
%
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,184
Cost:
$2,500
$2,852 36,097 $332 52 - - - - $2,852
36,097
kWh
$332
52
kW-months/year
-
-
MMBtu
-
-
%
08: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$3,151
Cost:
$500
$2,822 35,718 $329 51 - - - - $2,822
35,718
kWh
$329
51
kW-months/year
-
-
MMBtu
-
-
%
09: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$2,674
Cost:
$5,000
- - - - $2,674 164 - - -
-
kWh
-
-
kW-months/year
$2,674
164
MMBtu
-
-
%
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,288
Cost:
$1,000
$1,166 14,758 $122 19 - - - - $1,166
14,758
kWh
$122
19
kW-months/year
-
-
MMBtu
-
-
%
11: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,069
Cost:
$750
$3,069 29,447 - - - - - - $3,069
29,447
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
%
TOTAL RECOMMENDED Savings:
$65,678
Cost:
$67,200
$29,899 369,081 $3,221 501 $6,878 422 $25,680 - $29,899
369,081
kWh
$3,221
501
kW-months/year
$6,878
422
MMBtu
$25,680
-
%
TOTAL IMPLEMENTED Savings:
$48,543
Cost:
$58,500
$16,628 210,498 $2,031 316 $4,204 258 $25,680 - $16,628
210,498
kWh
$2,031
316
kW-months/year
$4,204
258
MMBtu
$25,680
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ %
Electricity Usage Electricity Demand Natural Gas Increase in Production Electricity Usage Electricity Demand Natural Gas Increase in Production