Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2007 |
Principal Product | Thermoplastic Compounds |
NAICS | 325211 - Plastics Material and Resin Manufacturing |
SIC | 3087 - Custom Compound Purchased Resins |
Sales | $10,000,000-$50,000,000 |
# of Employees | 86 |
Plant Area (Sq.Ft.) | 194,447 |
Annual Production | 1,700 Tons |
Production Hrs. Annual | 8,736 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $560,464 | 7,112,361 | kWh | $0.08 |
Electricity Demand | $106,612 | 16,529 | kW-months/year | $6.45 |
Natural Gas | $113,894 | 6,989 | MMBtu | $16.30 |
TOTAL ENERGY COSTS | $780,970 | |||
RECOMMENDED SAVINGS* | $65,678 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $48,543 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $25,680 Cost: $50,000 |
- | - | - | - | - | - | $25,680 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$25,680 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $10,103 Cost: $2,500 |
$9,046 | 114,525 | $1,057 | 164 | - | - | - | - |
$9,046 114,525 kWh |
$1,057 164 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $4,204 Cost: $2,000 |
- | - | - | - | $4,204 | 258 | - | - |
- - kWh |
- - kW-months/year |
$4,204 258 MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $4,727 Cost: $2,250 |
$4,233 | 53,587 | $494 | 77 | - | - | - | - |
$4,233 53,587 kWh |
$494 77 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $4,084 Cost: $500 |
$3,564 | 45,118 | $520 | 81 | - | - | - | - |
$3,564 45,118 kWh |
$520 81 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,514 Cost: $200 |
$3,147 | 39,831 | $367 | 57 | - | - | - | - |
$3,147 39,831 kWh |
$367 57 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,184 Cost: $2,500 |
$2,852 | 36,097 | $332 | 52 | - | - | - | - |
$2,852 36,097 kWh |
$332 52 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $3,151 Cost: $500 |
$2,822 | 35,718 | $329 | 51 | - | - | - | - |
$2,822 35,718 kWh |
$329 51 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $2,674 Cost: $5,000 |
- | - | - | - | $2,674 | 164 | - | - |
- - kWh |
- - kW-months/year |
$2,674 164 MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,288 Cost: $1,000 |
$1,166 | 14,758 | $122 | 19 | - | - | - | - |
$1,166 14,758 kWh |
$122 19 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $3,069 Cost: $750 |
$3,069 | 29,447 | - | - | - | - | - | - |
$3,069 29,447 kWh |
- - kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $65,678 Cost: $67,200 |
$29,899 | 369,081 | $3,221 | 501 | $6,878 | 422 | $25,680 | - | $29,899 369,081 kWh |
$3,221 501 kW-months/year |
$6,878 422 MMBtu |
$25,680 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $48,543 Cost: $58,500 |
$16,628 | 210,498 | $2,031 | 316 | $4,204 | 258 | $25,680 | - | $16,628 210,498 kWh |
$2,031 316 kW-months/year |
$4,204 258 MMBtu |
$25,680 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Increase in Production |