Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2010 |
Principal Product | injection molded ceramics |
NAICS | 327120 - Clay Building Material and Refractories Manufacturing |
SIC | 3297 - Nonclay Refractories |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 63,000 |
Annual Production | 2,500,000 Pieces |
Production Hrs. Annual | 7,488 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $231,047 | 2,376,288 | kWh | $0.10 |
Electricity Demand | $60,008 | 5,624 | kW-months/year | $10.67 |
Natural Gas | $347,939 | 61,902 | MMBtu | $5.62 |
TOTAL ENERGY COSTS | $638,994 | |||
RECOMMENDED SAVINGS* | $71,114 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $16,296 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes | Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $21,369 Cost: $20,000 |
$21,369 | 234,832 | - | - | - | - | - | - |
$21,369 234,832 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $20,231 Cost: $30,000 |
$7,225 | 79,403 | - | - | $1,500 | - | $11,506 | - |
$7,225 79,403 kWh |
- - MMBtu |
$1,500 - $ |
$11,506 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $15,010 Cost: $125 |
$7,348 | 80,750 | $7,662 | 1,363 | - | - | - | - |
$7,348 80,750 kWh |
$7,662 1,363 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $13,218 Cost: $47,450 |
$3,057 | 33,600 | $10,161 | 1,808 | - | - | - | - |
$3,057 33,600 kWh |
$10,161 1,808 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,286 Cost: $800 |
$1,286 | 14,131 | - | - | - | - | - | - |
$1,286 14,131 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $71,114 Cost: $98,375 |
$40,285 | 442,716 | $17,823 | 3,171 | $1,500 | - | $11,506 | - | $40,285 442,716 kWh |
$17,823 3,171 MMBtu |
$1,500 - $ |
$11,506 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $16,296 Cost: $925 |
$8,634 | 94,881 | $7,662 | 1,363 | - | - | - | - | $8,634 94,881 kWh |
$7,662 1,363 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes | Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes |