IAC logo
IAC Assessment: LE0319
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0319
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2011
Principal Product Canned Cat/Dog Food
NAICS 311111 - Dog and Cat Food Manufacturing
SIC 2047 - Dog And Cat Food
Sales $50,000,000-$100,000,000
# of Employees 57
Plant Area (Sq.Ft.) 186,000
Annual Production 65,000,000 Units
Production Hrs. Annual 8,400
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $545,259 5,149,664 kWh $0.11
Electricity Demand $250,846 18,103 kW-months/year $13.86
Natural Gas $569,098 81,829 MMBtu $6.95
TOTAL ENERGY COSTS $1,365,203
RECOMMENDED SAVINGS* $146,815 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,983
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal
$ kWh $ kW-months/year $ Tgal
01: 3.4151 MINIMIZE WATER USAGE Savings:
$66,284
Cost:
$168,000
- - - - $66,284 18,110,400 -
-
kWh
-
-
kW-months/year
$66,284
18,110,400
Tgal
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$30,212
Cost:
$5,424
$25,389 239,524 $4,823 348 - - $25,389
239,524
kWh
$4,823
348
kW-months/year
-
-
Tgal
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$22,751
Cost:
$160
$18,219 171,875 $4,532 327 - - $18,219
171,875
kWh
$4,532
327
kW-months/year
-
-
Tgal
04: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$16,771
Cost:
-
$16,771 158,215 - - - - $16,771
158,215
kWh
-
-
kW-months/year
-
-
Tgal
05: 3.4155 METER WASTE WATER Savings:
$10,797
Cost:
$3,240
$10,797 101,774 - - - - $10,797
101,774
kWh
-
-
kW-months/year
-
-
Tgal
TOTAL RECOMMENDED Savings:
$146,815
Cost:
$176,824
$71,176 671,388 $9,355 675 $66,284 18,110,400 $71,176
671,388
kWh
$9,355
675
kW-months/year
$66,284
18,110,400
Tgal
TOTAL IMPLEMENTED Savings:
$46,983
Cost:
$5,424
$42,160 397,739 $4,823 348 - - $42,160
397,739
kWh
$4,823
348
kW-months/year
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal