IAC logo
IAC Assessment: LE0327
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0327
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2011
Principal Product Lass 80 Heavy Duty Trucks
NAICS 336120 - Heavy Duty Truck Manufacturing
SIC 3711 - Motor Vehicles And Car Bodies
Sales $50,000,000-$100,000,000
# of Employees 107
Plant Area (Sq.Ft.) 930,000
Annual Production 11,800 Pieces
Production Hrs. Annual 2,080
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $767,104 11,218,000 kWh $0.07
Electricity Demand $13,967 26,230 kW-months/year $0.53
Natural Gas $643,875 70,486 MMBtu $9.13
TOTAL ENERGY COSTS $1,424,946
RECOMMENDED SAVINGS* $312,637 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $156,891
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$92,227
Cost:
$175,000
$40,160 590,594 $939 1,771 $51,128 5,600 $40,160
590,594
kWh
$939
1,771
kW-months/year
$51,128
5,600
MMBtu
02: 2.1224 REPLACE BOILER Savings:
$91,620
Cost:
$240,000
- - - - $91,620 10,035 -
-
kWh
-
-
kW-months/year
$91,620
10,035
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$61,378
Cost:
$125
$27,305 401,549 - - $34,073 3,732 $27,305
401,549
kWh
-
-
kW-months/year
$34,073
3,732
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$42,335
Cost:
$94,400
$41,404 608,880 $931 1,753 - - $41,404
608,880
kWh
$931
1,753
kW-months/year
-
-
MMBtu
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$15,778
Cost:
$2,102
$15,624 229,764 $154 291 - - $15,624
229,764
kWh
$154
291
kW-months/year
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,653
Cost:
$7,280
$5,653 83,121 - - - - $5,653
83,121
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,286
Cost:
$1,900
$3,211 47,226 $75 142 - - $3,211
47,226
kWh
$75
142
kW-months/year
-
-
MMBtu
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$360
Cost:
$400
$350 5,144 $10 18 - - $350
5,144
kWh
$10
18
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$312,637
Cost:
$521,207
$133,707 1,966,278 $2,109 3,975 $176,821 19,367 $133,707
1,966,278
kWh
$2,109
3,975
kW-months/year
$176,821
19,367
MMBtu
TOTAL IMPLEMENTED Savings:
$156,891
Cost:
$177,025
$70,676 1,039,369 $1,014 1,913 $85,201 9,332 $70,676
1,039,369
kWh
$1,014
1,913
kW-months/year
$85,201
9,332
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas