Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2012 |
Principal Product | Flavors and Fragrances |
NAICS | 325611 - Soap and Other Detergent Manufacturing |
SIC | 2844 - Toilet Preparations |
Sales | $100,000,000-$500,000,000 |
# of Employees | 29 |
Plant Area (Sq.Ft.) | 36,000 |
Annual Production | 2,147,483,647 Tons |
Production Hrs. Annual | 2,080 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $104,432 | 1,069,566 | kWh | $0.10 |
Electricity Demand | $27,794 | 3,885 | kW-months/year | $7.15 |
Natural Gas | $67,468 | 16,507 | MMBtu | $4.09 |
TOTAL ENERGY COSTS | $199,694 | |||
RECOMMENDED SAVINGS* | $33,224 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $21,307 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,060 Cost: $40 |
$745 | 7,601 | $315 | 44 | - | - | - | - |
$745 7,601 kWh |
$315 44 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,654 Cost: $1,000 |
$2,567 | 26,196 | $1,087 | 152 | - | - | - | - |
$2,567 26,196 kWh |
$1,087 152 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $6,115 Cost: - |
$6,115 | 62,400 | - | - | - | - | - | - |
$6,115 62,400 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $653 Cost: $2,000 |
- | - | - | - | $653 | 160 | - | - |
- - kWh |
- - kW-months/year |
$653 160 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $5,309 Cost: $20,000 |
- | - | - | - | $5,309 | 1,298 | - | - |
- - kWh |
- - kW-months/year |
$5,309 1,298 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE |
Savings: $10,156 Cost: $16,300 |
- | - | - | - | $156 | 38 | $10,000 | - |
- - kWh |
- - kW-months/year |
$156 38 MMBtu |
$10,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $4,814 Cost: $9,000 |
$4,485 | 45,760 | $1,129 | 158 | $(-800) | 195 | - | - |
$4,485 45,760 kWh |
$1,129 158 kW-months/year |
$(-800) 195 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $475 Cost: $675 |
- | - | - | - | $475 | 117 | - | - |
- - kWh |
- - kW-months/year |
$475 117 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $988 Cost: $4,050 |
$688 | 7,020 | $300 | 42 | - | - | - | - |
$688 7,020 kWh |
$300 42 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $33,224 Cost: $53,065 |
$14,600 | 148,977 | $2,831 | 396 | $5,793 | 1,808 | $10,000 | - | $14,600 148,977 kWh |
$2,831 396 kW-months/year |
$5,793 1,808 MMBtu |
$10,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $21,307 Cost: $40,015 |
$3,312 | 33,797 | $1,401 | 196 | $6,593 | 1,613 | $10,000 | - | $3,312 33,797 kWh |
$1,401 196 kW-months/year |
$6,593 1,613 MMBtu |
$10,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |