Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2014 |
Principal Product | Beverages |
NAICS | 311930 - Flavoring Syrup and Concentrate Manufacturing |
SIC | 2087 - Flavoring Extracts And Syrups, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 105 |
Plant Area (Sq.Ft.) | 270,000 |
Annual Production | 60,000,000 Units |
Production Hrs. Annual | 7,488 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $586,944 | 9,798,786 | kWh | $0.06 |
Electricity Demand | $45,151 | 21,220 | kW-months/year | $2.13 |
Electricity Fees | $24,445 | - | $ | - |
Natural Gas | $890,763 | 107,590 | MMBtu | $8.28 |
TOTAL ENERGY COSTS | $1,547,303 | |||
RECOMMENDED SAVINGS* | $249,716 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $138,105 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $8,661 Cost: $32 |
$8,258 | 137,639 | $403 | 189 | - | - |
$8,258 137,639 kWh |
$403 189 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $61,300 Cost: $2,592 |
- | - | - | - | $61,300 | 7,403 |
- - kWh |
- - kW-months/year |
$61,300 7,403 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $10,910 Cost: $1,000 |
$10,214 | 170,239 | $696 | 327 | - | - |
$10,214 170,239 kWh |
$696 327 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $43,975 Cost: $10,000 |
- | - | - | - | $43,975 | 5,311 |
- - kWh |
- - kW-months/year |
$43,975 5,311 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY |
Savings: $451 Cost: $232 |
$451 | 7,530 | - | - | - | - |
$451 7,530 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $12,502 Cost: $16,700 |
- | - | - | - | $12,502 | 1,510 |
- - kWh |
- - kW-months/year |
$12,502 1,510 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1224 REPLACE BOILER |
Savings: $102,338 Cost: $161,800 |
- | - | - | - | $102,338 | 12,360 |
- - kWh |
- - kW-months/year |
$102,338 12,360 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $6,813 Cost: $20,000 |
$6,517 | 108,617 | $296 | 139 | - | - |
$6,517 108,617 kWh |
$296 139 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $757 Cost: $2,250 |
$723 | 12,056 | $34 | 16 | - | - |
$723 12,056 kWh |
$34 16 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $2,010 Cost: $6,000 |
$3,330 | 55,499 | $162 | 76 | $(-1,482) | (-179) |
$3,330 55,499 kWh |
$162 76 kW-months/year |
$(-1,482) (-179) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $249,716 Cost: $220,606 |
$29,493 | 491,580 | $1,590 | 747 | $218,633 | 26,405 | $29,493 491,580 kWh |
$1,590 747 kW-months/year |
$218,633 26,405 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $138,105 Cost: $32,574 |
$19,195 | 319,934 | $1,133 | 532 | $117,777 | 14,224 | $19,195 319,934 kWh |
$1,133 532 kW-months/year |
$117,777 14,224 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |