IAC Assessment: LE0390
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0390
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2015
Principal Product Steel Wire and Related Products
NAICS 331222 - Steel Wire Drawing
SIC 3315 - Steel Wire And Related Products
Sales $10,000,000-$50,000,000
# of Employees 39
Plant Area (Sq.Ft.) 73,880
Annual Production 25,084,000 Pounds
Production Hrs. Annual 6,864
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $266,922 3,692,000 kWh $0.07
Electricity Demand $50,711 12,097 kW-months/year $4.19
Electricity Fees $71,389 - $ -
TOTAL ENERGY COSTS $389,022
RECOMMENDED SAVINGS* $107,339 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,479
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,174
Cost:
$28
$2,880 40,003 $293 70 - - - - $2,880
40,003
kWh
$293
70
kW-months/year
-
-
MMBtu
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$34,972
Cost:
$5,400
$50,392 699,882 - - $(-15,420) (-2,056) - - $50,392
699,882
kWh
-
-
kW-months/year
$(-15,420)
(-2,056)
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,489
Cost:
$1,000
$4,982 69,192 $507 121 - - - - $4,982
69,192
kWh
$507
121
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$398
Cost:
$75
$398 5,535 - - - - - - $398
5,535
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$558
Cost:
$120
$507 7,038 $52 12 - - - - $507
7,038
kWh
$52
12
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$47,479
Cost:
$25,500
$43,095 598,541 $4,384 1,046 - - - - $43,095
598,541
kWh
$4,384
1,046
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,361
Cost:
$2,457
$3,563 49,488 $797 192 - - - - $3,563
49,488
kWh
$797
192
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,333
Cost:
$5,028
$4,296 59,673 $36 9 - - - - $4,296
59,673
kWh
$36
9
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,974
Cost:
$7,332
$3,654 50,755 $141 34 - - $179 - $3,654
50,755
kWh
$141
34
kW-months/year
-
-
MMBtu
$179
-
$
10: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$2,602
Cost:
$5,200
$2,602 36,145 - - - - - - $2,602
36,145
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$107,339
Cost:
$52,140
$116,370 1,616,252 $6,211 1,484 $(-15,420) (-2,056) $179 - $116,370
1,616,252
kWh
$6,211
1,484
kW-months/year
$(-15,420)
(-2,056)
MMBtu
$179
-
$
TOTAL IMPLEMENTED Savings:
$47,479
Cost:
$25,500
$43,095 598,541 $4,384 1,046 - - - - $43,095
598,541
kWh
$4,384
1,046
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost