IAC Assessment: LE0413
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0413
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2016
Principal Product wire rope
NAICS 332618 - Other Fabricated Wire Product Manufacturing
SIC 3315 - Steel Wire And Related Products
Sales $100,000,000-$500,000,000
# of Employees 140
Plant Area (Sq.Ft.) 186,600
Annual Production 30,751 Tons
Production Hrs. Annual 8,736
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $363,708 6,327,900 kWh $0.06
Electricity Demand $29,210 13,733 kW-months/year $2.13
Electricity Fees $16,824 - $ -
Natural Gas $33,763 4,923 MMBtu $6.86
TOTAL ENERGY COSTS $443,505
RECOMMENDED SAVINGS* $38,559 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,940
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$5,124
Cost:
$500
- - - - $5,124 747 -
-
kWh
-
-
kW-months/year
$5,124
747
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,494
Cost:
$725
$1,494 26,208 - - - - $1,494
26,208
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,060
Cost:
$1,800
- - - - $3,060 446 -
-
kWh
-
-
kW-months/year
$3,060
446
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$973
Cost:
$1,000
$865 15,173 $109 51 - - $865
15,173
kWh
$109
51
kW-months/year
-
-
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$482
Cost:
$590
$66 1,158 - - $416 61 $66
1,158
kWh
-
-
kW-months/year
$416
61
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,404
Cost:
$15,000
$8,085 141,842 $320 150 - - $8,085
141,842
kWh
$320
150
kW-months/year
-
-
MMBtu
07: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$13,462
Cost:
$25,000
$12,025 210,960 $1,438 675 - - $12,025
210,960
kWh
$1,438
675
kW-months/year
-
-
MMBtu
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,559
Cost:
$14,000
$8,670 152,100 $848 398 $(-3,958) (-577) $8,670
152,100
kWh
$848
398
kW-months/year
$(-3,958)
(-577)
MMBtu
TOTAL RECOMMENDED Savings:
$38,559
Cost:
$58,615
$31,204 547,441 $2,714 1,274 $4,641 677 $31,204
547,441
kWh
$2,714
1,274
kW-months/year
$4,641
677
MMBtu
TOTAL IMPLEMENTED Savings:
$29,940
Cost:
$42,815
$22,534 395,341 $1,866 876 $5,540 808 $22,534
395,341
kWh
$1,866
876
kW-months/year
$5,540
808
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas