Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2016 |
Principal Product | wire rope |
NAICS | 332618 - Other Fabricated Wire Product Manufacturing |
SIC | 3315 - Steel Wire And Related Products |
Sales | $100,000,000-$500,000,000 |
# of Employees | 140 |
Plant Area (Sq.Ft.) | 186,600 |
Annual Production | 30,751 Tons |
Production Hrs. Annual | 8,736 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $363,708 | 6,327,900 | kWh | $0.06 |
Electricity Demand | $29,210 | 13,733 | kW-months/year | $2.13 |
Electricity Fees | $16,824 | - | $ | - |
Natural Gas | $33,763 | 4,923 | MMBtu | $6.86 |
TOTAL ENERGY COSTS | $443,505 | |||
RECOMMENDED SAVINGS* | $38,559 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $29,940 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $5,124 Cost: $500 |
- | - | - | - | $5,124 | 747 |
- - kWh |
- - kW-months/year |
$5,124 747 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,494 Cost: $725 |
$1,494 | 26,208 | - | - | - | - |
$1,494 26,208 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $3,060 Cost: $1,800 |
- | - | - | - | $3,060 | 446 |
- - kWh |
- - kW-months/year |
$3,060 446 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $973 Cost: $1,000 |
$865 | 15,173 | $109 | 51 | - | - |
$865 15,173 kWh |
$109 51 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $482 Cost: $590 |
$66 | 1,158 | - | - | $416 | 61 |
$66 1,158 kWh |
- - kW-months/year |
$416 61 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $8,404 Cost: $15,000 |
$8,085 | 141,842 | $320 | 150 | - | - |
$8,085 141,842 kWh |
$320 150 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $13,462 Cost: $25,000 |
$12,025 | 210,960 | $1,438 | 675 | - | - |
$12,025 210,960 kWh |
$1,438 675 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $5,559 Cost: $14,000 |
$8,670 | 152,100 | $848 | 398 | $(-3,958) | (-577) |
$8,670 152,100 kWh |
$848 398 kW-months/year |
$(-3,958) (-577) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $38,559 Cost: $58,615 |
$31,204 | 547,441 | $2,714 | 1,274 | $4,641 | 677 | $31,204 547,441 kWh |
$2,714 1,274 kW-months/year |
$4,641 677 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $29,940 Cost: $42,815 |
$22,534 | 395,341 | $1,866 | 876 | $5,540 | 808 | $22,534 395,341 kWh |
$1,866 876 kW-months/year |
$5,540 808 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |