IAC Assessment: LE0497
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2020
Principal Product Cabinets and Enclosures
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 20
Plant Area (Sq.Ft.) 87,000
Annual Production 6,000 Units
Production Hrs. Annual 4,160
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $206,927 1,441,124 kWh $0.14
Electricity Demand $44,668 3,153 kW-months/year $14.17
Electricity Fees $5,335 - $ -
Natural Gas $77,549 8,653 MMBtu $8.96
TOTAL ENERGY COSTS $334,479
RECOMMENDED SAVINGS* $50,941 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,793
Cost:
$4,200
$3,174 22,040 $4,619 326 - - $3,174
22,040
kWh
$4,619
326
kW-months/year
-
-
MMBtu
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$13,727
Cost:
$10,000
$8,626 59,904 $5,101 360 - - $8,626
59,904
kWh
$5,101
360
kW-months/year
-
-
MMBtu
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$21,231
Cost:
$32,000
$16,711 116,052 $4,520 319 - - $16,711
116,052
kWh
$4,520
319
kW-months/year
-
-
MMBtu
04: 2.7263 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION Savings:
$2,905
Cost:
$5,000
$2,267 15,744 $638 45 - - $2,267
15,744
kWh
$638
45
kW-months/year
-
-
MMBtu
05: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$1,765
Cost:
$4,600
- - - - $1,765 197 -
-
kWh
-
-
kW-months/year
$1,765
197
MMBtu
06: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$3,520
Cost:
$13,000
$(-42) (-291) $(-156) (-11) $3,718 415 $(-42)
(-291)
kWh
$(-156)
(-11)
kW-months/year
$3,718
415
MMBtu
TOTAL RECOMMENDED Savings:
$50,941
Cost:
$68,800
$30,736 213,449 $14,722 1,039 $5,483 612 $30,736
213,449
kWh
$14,722
1,039
kW-months/year
$5,483
612
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas