IAC Assessment: LE0516
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0516
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2021
Principal Product Flexible Packaging
NAICS 326112 - Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 2671 - Paper Coated & Laminated, Packaging
Sales $50,000,000-$100,000,000
# of Employees 255
Plant Area (Sq.Ft.) 65,000
Annual Production 20,000,000 Units
Production Hrs. Annual 8,736
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $182,201 6,210,044 kWh $0.03
Electricity Demand $56,484 11,551 kW-months/year $4.89
Electricity Fees $64,955 - $ -
Natural Gas $139,881 32,033 MMBtu $4.37
TOTAL ENERGY COSTS $443,521
RECOMMENDED SAVINGS* $34,912 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,635
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,511
Cost:
$200
$1,227 42,172 $284 58 $1,227
42,172
kWh
$284
58
kW-months/year
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,124
Cost:
$1,200
$1,104 37,067 $20 4 $1,104
37,067
kWh
$20
4
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,984
Cost:
$30,000
$14,700 506,882 $284 58 $14,700
506,882
kWh
$284
58
kW-months/year
04: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$8,448
Cost:
$25,000
$6,859 236,511 $1,589 325 $6,859
236,511
kWh
$1,589
325
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,118
Cost:
$11,000
$2,556 88,153 $562 115 $2,556
88,153
kWh
$562
115
kW-months/year
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$5,727
Cost:
$36,000
$4,646 160,197 $1,081 221 $4,646
160,197
kWh
$1,081
221
kW-months/year
TOTAL RECOMMENDED Savings:
$34,912
Cost:
$103,400
$31,092 1,070,982 $3,820 781 $31,092
1,070,982
kWh
$3,820
781
kW-months/year
TOTAL IMPLEMENTED Savings:
$2,635
Cost:
$1,400
$2,331 79,239 $304 62 $2,331
79,239
kWh
$304
62
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand