Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2021 |
Principal Product | Flexible Packaging |
NAICS | 326112 - Plastics Packaging Film and Sheet (including Laminated) Manufacturing |
SIC | 2671 - Paper Coated & Laminated, Packaging |
Sales | $50,000,000-$100,000,000 |
# of Employees | 255 |
Plant Area (Sq.Ft.) | 65,000 |
Annual Production | 20,000,000 Units |
Production Hrs. Annual | 8,736 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $182,201 | 6,210,044 | kWh | $0.03 |
Electricity Demand | $56,484 | 11,551 | kW-months/year | $4.89 |
Electricity Fees | $64,955 | - | $ | - |
Natural Gas | $139,881 | 32,033 | MMBtu | $4.37 |
TOTAL ENERGY COSTS | $443,521 | |||
RECOMMENDED SAVINGS* | $34,912 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,635 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Usage | Electricity Demand | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,511 Cost: $200 |
$1,227 | 42,172 | $284 | 58 |
$1,227 42,172 kWh |
$284 58 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,124 Cost: $1,200 |
$1,104 | 37,067 | $20 | 4 |
$1,104 37,067 kWh |
$20 4 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $14,984 Cost: $30,000 |
$14,700 | 506,882 | $284 | 58 |
$14,700 506,882 kWh |
$284 58 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $8,448 Cost: $25,000 |
$6,859 | 236,511 | $1,589 | 325 |
$6,859 236,511 kWh |
$1,589 325 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,118 Cost: $11,000 |
$2,556 | 88,153 | $562 | 115 |
$2,556 88,153 kWh |
$562 115 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $5,727 Cost: $36,000 |
$4,646 | 160,197 | $1,081 | 221 |
$4,646 160,197 kWh |
$1,081 221 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $34,912 Cost: $103,400 |
$31,092 | 1,070,982 | $3,820 | 781 | $31,092 1,070,982 kWh |
$3,820 781 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,635 Cost: $1,400 |
$2,331 | 79,239 | $304 | 62 | $2,331 79,239 kWh |
$304 62 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Usage | Electricity Demand |