IAC Assessment: LE0518
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0518
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2022
Principal Product Cans
NAICS 332431 - Metal Can Manufacturing
SIC 3411 - Metal Cans
Sales $100,000,000-$500,000,000
# of Employees 84
Plant Area (Sq.Ft.) 265,000
Annual Production 1,000,000,000 Units
Production Hrs. Annual 8,736
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,178,010 19,009,361 kWh $0.06
Electricity Demand $147,730 26,907 kW-months/year $5.49
Electricity Fees $109,988 - $ -
Natural Gas $744,589 162,650 MMBtu $4.58
TOTAL ENERGY COSTS $2,180,317
RECOMMENDED SAVINGS* $189,139 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $75,114
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,198
Cost:
$2,600
$5,649 91,100 $549 100 - - $5,649
91,100
kWh
$549
100
kW-months/year
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$6,190
Cost:
$4,000
$5,533 89,241 $657 123 - - $5,533
89,241
kWh
$657
123
kW-months/year
-
-
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,790
Cost:
$8,800
$6,027 101,206 $763 139 - - $6,027
101,206
kWh
$763
139
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,077
Cost:
$30,000
$8,984 144,908 $1,093 199 - - $8,984
144,908
kWh
$1,093
199
kW-months/year
-
-
MMBtu
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$45,859
Cost:
$175,000
$42,263 681,656 $3,596 655 - - $42,263
681,656
kWh
$3,596
655
kW-months/year
-
-
MMBtu
06: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$114,025
Cost:
$450,000
$(-6,122) (-97,755) - - $120,147 26,233 $(-6,122)
(-97,755)
kWh
-
-
kW-months/year
$120,147
26,233
MMBtu
TOTAL RECOMMENDED Savings:
$189,139
Cost:
$670,400
$62,334 1,010,356 $6,658 1,216 $120,147 26,233 $62,334
1,010,356
kWh
$6,658
1,216
kW-months/year
$120,147
26,233
MMBtu
TOTAL IMPLEMENTED Savings:
$75,114
Cost:
$220,400
$68,456 1,108,111 $6,658 1,216 - - $68,456
1,108,111
kWh
$6,658
1,216
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas