IAC logo
IAC Assessment: LE0530
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0530
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2022
Principal Product Injected Molded Containers
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 90,000
Annual Production 300,000,000 Units
Production Hrs. Annual 6,240
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $531,665 5,614,650 kWh $0.09
Electricity Demand $81,369 12,725 kW-months/year $6.39
Electricity Fees $92,486 - $ -
Natural Gas $33,194 2,448 MMBtu $13.56
TOTAL ENERGY COSTS $738,714
RECOMMENDED SAVINGS* $107,396 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,342
Cost:
$1,840
$6,342 66,754 - - $6,342
66,754
kWh
-
-
kW-months/year
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$84,060
Cost:
$56,000
$76,950 812,448 $7,110 1,116 $76,950
812,448
kWh
$7,110
1,116
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,986
Cost:
$5,500
$4,414 46,468 $572 89 $4,414
46,468
kWh
$572
89
kW-months/year
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,313
Cost:
$6,000
$2,934 30,880 $379 59 $2,934
30,880
kWh
$379
59
kW-months/year
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$8,695
Cost:
$17,000
$7,699 81,043 $996 156 $7,699
81,043
kWh
$996
156
kW-months/year
TOTAL RECOMMENDED Savings:
$107,396
Cost:
$86,340
$98,339 1,037,593 $9,057 1,420 $98,339
1,037,593
kWh
$9,057
1,420
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand