IAC logo
IAC Assessment: LE0543
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0543
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2023
Principal Product Chicken
NAICS 311615 - Poultry Processing
SIC 2015 - Poultry Slaughtering And Processing
Sales $5,000,000-$10,000,000
# of Employees 36
Plant Area (Sq.Ft.) 15,000
Annual Production 2,000,000 Pounds
Production Hrs. Annual 3,120
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $51,025 412,960 kWh $0.12
Electricity Demand $37,620 1,364 kW-months/year $27.58
Electricity Fees $6,396 - $ -
Natural Gas $33,791 2,865 MMBtu $11.79
TOTAL ENERGY COSTS $128,832
RECOMMENDED SAVINGS* $11,219 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,622
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$839
Cost:
$100
$452 3,650 $387 14 - - $452
3,650
kWh
$387
14
kW-months/year
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,597
Cost:
$3,000
$935 7,537 $662 24 - - $935
7,537
kWh
$662
24
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,298
Cost:
$8,400
$1,115 9,000 $3,183 115 - - $1,115
9,000
kWh
$3,183
115
kW-months/year
-
-
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$210
Cost:
$760
- - - - $210 18 -
-
kWh
-
-
kW-months/year
$210
18
MMBtu
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$2,200
Cost:
$9,000
$1,306 10,533 $894 32 - - $1,306
10,533
kWh
$894
32
kW-months/year
-
-
MMBtu
06: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$2,075
Cost:
$13,169
- - - - $2,075 176 -
-
kWh
-
-
kW-months/year
$2,075
176
MMBtu
TOTAL RECOMMENDED Savings:
$11,219
Cost:
$34,429
$3,808 30,720 $5,126 185 $2,285 194 $3,808
30,720
kWh
$5,126
185
kW-months/year
$2,285
194
MMBtu
TOTAL IMPLEMENTED Savings:
$9,622
Cost:
$31,429
$2,873 23,183 $4,464 161 $2,285 194 $2,873
23,183
kWh
$4,464
161
kW-months/year
$2,285
194
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas