Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2023 |
Principal Product | Ceramic Materials |
NAICS | 212325 - Clay and Ceramic and Refractory Minerals Mining |
SIC | 1459 - Clay And Related Minerals, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 30 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 100 Tons |
Production Hrs. Annual | 8,736 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $82,666 | 1,150,600 | kWh | $0.07 |
Electricity Demand | $14,330 | 2,966 | kW-months/year | $4.83 |
Electricity Fees | $7,348 | - | $ | - |
Natural Gas | $10,320 | 1,021 | MMBtu | $10.11 |
TOTAL ENERGY COSTS | $308,987 | |||
RECOMMENDED SAVINGS* | $101,716 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $96,917 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,663 Cost: $100 |
$2,439 | 33,884 | $224 | 47 | - | - | - | - | - | - | - | - |
$2,439 33,884 kWh |
$224 47 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $1,474 Cost: $2,500 |
- | - | - | - | $1,474 | 146 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,474 146 MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,539 Cost: $3,500 |
$1,408 | 19,552 | $131 | 27 | - | - | - | - | - | - | - | - |
$1,408 19,552 kWh |
$131 27 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $299 Cost: $1,150 |
$276 | 3,833 | $23 | 5 | - | - | - | - | - | - | - | - |
$276 3,833 kWh |
$23 5 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.1181 ELIMINATE A BY-PRODUCT |
Savings: $85,450 Cost: $350,000 |
- | - | - | - | - | - | $(-3,276) | (-50,400) | $134,568 | 50,400 | $(-45,842) | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$(-3,276) (-50,400) Tgal |
$134,568 50,400 gal |
$(-45,842) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $4,500 Cost: $22,000 |
$4,121 | 57,241 | $379 | 79 | - | - | - | - | - | - | - | - |
$4,121 57,241 kWh |
$379 79 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $5,791 Cost: $34,566 |
$3,756 | 52,162 | $337 | 70 | $1,698 | 168 | - | - | - | - | - | - |
$3,756 52,162 kWh |
$337 70 kW-months/year |
$1,698 168 MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $101,716 Cost: $413,816 |
$12,000 | 166,672 | $1,094 | 227 | $3,172 | 314 | $(-3,276) | (-50,400) | $134,568 | 50,400 | $(-45,842) | - | $12,000 166,672 kWh |
$1,094 227 kW-months/year |
$3,172 314 MMBtu |
$(-3,276) (-50,400) Tgal |
$134,568 50,400 gal |
$(-45,842) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $96,917 Cost: $390,666 |
$7,603 | 105,598 | $692 | 144 | $3,172 | 314 | $(-3,276) | (-50,400) | $134,568 | 50,400 | $(-45,842) | - | $7,603 105,598 kWh |
$692 144 kW-months/year |
$3,172 314 MMBtu |
$(-3,276) (-50,400) Tgal |
$134,568 50,400 gal |
$(-45,842) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Personnel Changes |