IAC logo
IAC Assessment: LE0561
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0561
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2024
Principal Product Plastic Acrylic File
NAICS 326130 - Laminated Plastics Plate, Sheet (except Packaging), and Shape Manufacturing
SIC 3083 - Laminated Plastics Plate & Sheet
Sales $10,000,000-$50,000,000
# of Employees 19
Plant Area (Sq.Ft.) 30,000
Annual Production 120,000 Pounds
Production Hrs. Annual 4,160
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $110,573 791,049 kWh $0.14
Electricity Demand $31,888 4,059 kW-months/year $7.86
Electricity Fees $4,450 - $ -
Natural Gas $48,118 5,985 MMBtu $8.04
TOTAL ENERGY COSTS $195,029
RECOMMENDED SAVINGS* $35,732 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Raw Material Electricity Usage Electricity Demand Natural Gas Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,626
Cost:
$100
$1,398 9,984 $228 29 - - - - $1,398
9,984
kWh
$228
29
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,473
Cost:
$1,400
$10,735 76,676 $1,738 221 - - - - $10,735
76,676
kWh
$1,738
221
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,883
Cost:
$1,832
- - - - $3,883 483 - - -
-
kWh
-
-
kW-months/year
$3,883
483
MMBtu
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$14,950
Cost:
$12,995
$910 6,500 - - - - $14,040 - $910
6,500
kWh
-
-
kW-months/year
-
-
MMBtu
$14,040
-
$
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,803
Cost:
$5,143
$1,599 11,424 $204 26 - - - - $1,599
11,424
kWh
$204
26
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$997
Cost:
$3,220
$792 5,658 $205 26 - - - - $792
5,658
kWh
$205
26
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$35,732
Cost:
$24,690
$15,434 110,242 $2,375 302 $3,883 483 $14,040 - $15,434
110,242
kWh
$2,375
302
kW-months/year
$3,883
483
MMBtu
$14,040
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Primary Raw Material Electricity Usage Electricity Demand Natural Gas Primary Raw Material