IAC logo
IAC Assessment: LE0574
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0574
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2024
Principal Product metal forming
NAICS 332322 - Sheet Metal Work Manufacturing
SIC 3444 - Sheet Metalwork
Sales $1,000,000-$5,000,000
# of Employees 40
Plant Area (Sq.Ft.) 60,000
Annual Production 550 Units
Production Hrs. Annual 3,380
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,481 748,651 kWh $0.12
Electricity Demand $16,564 3,239 kW-months/year $5.11
Electricity Fees $3,375 - $ -
Natural Gas $168,224 23,429 MMBtu $7.18
TOTAL ENERGY COSTS $275,644
RECOMMENDED SAVINGS* $117,275 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$11,872
Cost:
$2,400
$11,872 101,924 - - - - $11,872
101,924
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$20,430
Cost:
$5,760
$17,685 151,174 $2,745 537 - - $17,685
151,174
kWh
$2,745
537
kW-months/year
-
-
MMBtu
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$32,332
Cost:
$69,375
- - - - $32,332 4,503 -
-
kWh
-
-
kW-months/year
$32,332
4,503
MMBtu
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$13,704
Cost:
$32,395
$11,864 101,400 $1,840 360 - - $11,864
101,400
kWh
$1,840
360
kW-months/year
-
-
MMBtu
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$14,969
Cost:
$45,000
$14,616 124,925 $353 69 - - $14,616
124,925
kWh
$353
69
kW-months/year
-
-
MMBtu
06: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$23,968
Cost:
$911,000
$3,407 29,120 $981 192 $19,580 2,727 $3,407
29,120
kWh
$981
192
kW-months/year
$19,580
2,727
MMBtu
TOTAL RECOMMENDED Savings:
$117,275
Cost:
$1,065,930
$59,444 508,543 $5,919 1,158 $51,912 7,230 $59,444
508,543
kWh
$5,919
1,158
kW-months/year
$51,912
7,230
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas