IAC Assessment: LE0576
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0576
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2024
Principal Product electronic connectors
NAICS 335931 - Current-Carrying Wiring Device Manufacturing
SIC 3678 - Electronic Connectors
Sales $100,000,000-$500,000,000
# of Employees 239
Plant Area (Sq.Ft.) 108,000
Annual Production 310,433 Units
Production Hrs. Annual 4,212
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $344,582 6,248,000 kWh $0.06
Electricity Demand $97,436 18,912 kW-months/year $5.15
Electricity Fees $56,795 - $ -
Natural Gas $18,544 1,784 MMBtu $10.39
TOTAL ENERGY COSTS $517,357
RECOMMENDED SAVINGS* $426,075 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$8,432
Cost:
-
$5,637 102,488 - - $2,795 269 - - $5,637
102,488
kWh
-
-
kW-months/year
$2,795
269
MMBtu
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,203
Cost:
-
$2,467 44,863 $736 143 - - - - $2,467
44,863
kWh
$736
143
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$486
Cost:
$75
$486 8,829 - - - - - - $486
8,829
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$14,556
Cost:
$2,500
- - - - $14,556 1,401 - - -
-
kWh
-
-
kW-months/year
$14,556
1,401
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,123
Cost:
$560
$2,604 47,349 $519 101 - - - - $2,604
47,349
kWh
$519
101
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$8,208
Cost:
$2,500
- - - - $8,208 790 - - -
-
kWh
-
-
kW-months/year
$8,208
790
MMBtu
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,633
Cost:
$4,000
$3,303 60,060 $330 64 - - - - $3,303
60,060
kWh
$330
64
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,069
Cost:
$4,000
$1,858 33,779 $211 41 - - - - $1,858
33,779
kWh
$211
41
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$17,682
Cost:
$55,039
$16,817 305,760 $865 168 - - - - $16,817
305,760
kWh
$865
168
kW-months/year
-
-
MMBtu
-
-
$
10: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$54,887
Cost:
$613,200
$31,767 577,586 - - - - $23,120 - $31,767
577,586
kWh
-
-
kW-months/year
-
-
MMBtu
$23,120
-
$
11: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$309,796
Cost:
$3,462,200
$179,356 3,261,024 - - - - $130,440 - $179,356
3,261,024
kWh
-
-
kW-months/year
-
-
MMBtu
$130,440
-
$
TOTAL RECOMMENDED Savings:
$426,075
Cost:
$4,144,074
$244,295 4,441,738 $2,661 517 $25,559 2,460 $153,560 - $244,295
4,441,738
kWh
$2,661
517
kW-months/year
$25,559
2,460
MMBtu
$153,560
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost