IAC Assessment: LE0577
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0577
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2024
Principal Product Motor Veichle parts
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 325
Plant Area (Sq.Ft.) 146,000
Annual Production 480,000 Units
Production Hrs. Annual 6,240
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $299,059 3,132,802 kWh $0.10
Electricity Demand $23,694 8,467 kW-months/year $2.80
Electricity Fees $2,760 - $ -
Natural Gas $27,663 3,443 MMBtu $8.03
TOTAL ENERGY COSTS $353,176
RECOMMENDED SAVINGS* $135,994 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$12,747
Cost:
-
$7,893 83,086 - - $4,854 604 - - $7,893
83,086
kWh
-
-
kW-months/year
$4,854
604
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,635
Cost:
$1,400
$2,495 26,247 $140 50 - - - - $2,495
26,247
kWh
$140
50
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,253
Cost:
$790
$1,186 12,480 $67 24 - - - - $1,186
12,480
kWh
$67
24
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$73,468
Cost:
$68,000
$(-31,418) (-330,720) $(-1,781) (-636) - - $106,667 - $(-31,418)
(-330,720)
kWh
$(-1,781)
(-636)
kW-months/year
-
-
MMBtu
$106,667
-
$
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$42,420
Cost:
$96,793
$41,745 439,421 $675 241 - - - - $41,745
439,421
kWh
$675
241
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$3,471
Cost:
$16,498
$3,298 34,710 $824 294 $(-651) (-81) - - $3,298
34,710
kWh
$824
294
kW-months/year
$(-651)
(-81)
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$135,994
Cost:
$183,481
$25,199 265,224 $(-75) (-27) $4,203 523 $106,667 - $25,199
265,224
kWh
$(-75)
(-27)
kW-months/year
$4,203
523
MMBtu
$106,667
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product