IAC Assessment: LE0583
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0583
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2024
Principal Product paper products
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2621 - Paper Mills
Sales $50,000,000-$100,000,000
# of Employees 204
Plant Area (Sq.Ft.) 500,000
Annual Production 65,000 Tons
Production Hrs. Annual 8,736
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,525,657 56,969,343 kWh $0.06
Electricity Demand $483,388 78,050 kW-months/year $6.19
Electricity Fees $1,079,245 - $ -
Natural Gas $3,776,541 837,218 MMBtu $4.51
TOTAL ENERGY COSTS $8,864,831
RECOMMENDED SAVINGS* $2,060,711 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,486
Cost:
-
$8,341 134,534 $1,145 185 - - $8,341
134,534
kWh
$1,145
185
kW-months/year
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$23,430
Cost:
$2,300
$20,604 332,337 $2,826 457 - - $20,604
332,337
kWh
$2,826
457
kW-months/year
-
-
MMBtu
03: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$344,366
Cost:
$63,000
$(-140,841) (-2,271,629) $(-1,604) (-259) $486,811 107,940 $(-140,841)
(-2,271,629)
kWh
$(-1,604)
(-259)
kW-months/year
$486,811
107,940
MMBtu
04: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$19,014
Cost:
$7,000
$19,014 306,685 - - - - $19,014
306,685
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$27,716
Cost:
$10,250
$24,373 393,120 $3,343 540 - - $24,373
393,120
kWh
$3,343
540
kW-months/year
-
-
MMBtu
06: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$1,627,510
Cost:
$8,755,000
$3,385,200 54,600,000 $482,820 78,000 $(-2,240,510) (-496,787) $3,385,200
54,600,000
kWh
$482,820
78,000
kW-months/year
$(-2,240,510)
(-496,787)
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,189
Cost:
$49,500
$8,081 130,341 $1,108 179 - - $8,081
130,341
kWh
$1,108
179
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$2,060,711
Cost:
$8,887,050
$3,324,772 53,625,388 $489,638 79,102 $(-1,753,699) (-388,847) $3,324,772
53,625,388
kWh
$489,638
79,102
kW-months/year
$(-1,753,699)
(-388,847)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas