IAC Assessment: LE0592
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0592
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2025
Principal Product Deli Items
NAICS 311612 - Meat Processed from Carcasses
SIC 2013 - Sausages And Other Prepared Meats
Sales $50,000,000-$100,000,000
# of Employees 95
Plant Area (Sq.Ft.) 55,000
Annual Production 16,000,000 Pounds
Production Hrs. Annual 3,120
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $408,450 4,084,499 kWh $0.10
Electricity Demand $143,062 16,831 kW-months/year $8.50
Electricity Fees $2,604 - $ -
Natural Gas $284,760 61,016 MMBtu $4.67
TOTAL ENERGY COSTS $838,876
RECOMMENDED SAVINGS* $120,609 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,457
Cost:
$100
$4,867 48,672 $1,590 187 - - - - $4,867
48,672
kWh
$1,590
187
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$40,366
Cost:
$3,000
$33,634 336,336 $6,732 792 - - - - $33,634
336,336
kWh
$6,732
792
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,485
Cost:
$7,000
$6,485 65,848 - - - - - - $6,485
65,848
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$2,361
Cost:
$3,915
$2,114 21,137 $247 29 - - - - $2,114
21,137
kWh
$247
29
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,195
Cost:
$4,000
$1,872 18,720 $323 38 - - - - $1,872
18,720
kWh
$323
38
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$12,213
Cost:
$24,000
$9,204 92,040 $3,009 354 - - - - $9,204
92,040
kWh
$3,009
354
kW-months/year
-
-
MMBtu
-
-
$
07: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$43,842
Cost:
$126,000
$23,561 235,611 $306 36 - - $19,975 - $23,561
235,611
kWh
$306
36
kW-months/year
-
-
MMBtu
$19,975
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,177
Cost:
$26,000
$4,655 46,550 $1,522 179 - - - - $4,655
46,550
kWh
$1,522
179
kW-months/year
-
-
MMBtu
-
-
$
09: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$513
Cost:
$2,500
$(-326) (-3,259) $(-76) (-9) $915 196 - - $(-326)
(-3,259)
kWh
$(-76)
(-9)
kW-months/year
$915
196
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$120,609
Cost:
$196,515
$86,066 861,655 $13,653 1,606 $915 196 $19,975 - $86,066
861,655
kWh
$13,653
1,606
kW-months/year
$915
196
MMBtu
$19,975
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost