IAC Assessment: LS0004
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LS0004
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2017
Principal Product Ready Mix Concrete
NAICS 327320 - Ready-Mix Concrete Manufacturing
SIC 3273 - Ready-mixed Concrete
Sales $10,000,000-$50,000,000
# of Employees 38
Plant Area (Sq.Ft.) 4,000
Annual Production 10,000 Units
Production Hrs. Annual 2,600
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $10,432 69,194 kWh $0.15
Electricity Demand $206 36 kW-months/year $5.77
Fuel Oil #1 $275,000 19,971 MMBtu $13.77
TOTAL ENERGY COSTS $285,921
RECOMMENDED SAVINGS* $54,260 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #1 Personnel Changes Administrative Changes Water Consumption Electricity Usage Fuel Oil #1 Personnel Changes Administrative Changes Water Consumption
$ kWh $ MMBtu $ $ $ $ $ Tgal
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$43,789
Cost:
-
- - $659 47 $17,252 - $25,878 - - - -
-
kWh
$659
47
MMBtu
$17,252
-
$
$25,878
-
$
-
-
Tgal
02: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$6,311
Cost:
-
- - $86 6 $2,850 - $3,375 - - - -
-
kWh
$86
6
MMBtu
$2,850
-
$
$3,375
-
$
-
-
Tgal
03: 3.4151 MINIMIZE WATER USAGE Savings:
$2,256
Cost:
-
- - - - - - - - $2,256 - -
-
kWh
-
-
MMBtu
-
-
$
-
-
$
$2,256
-
Tgal
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$627
Cost:
-
$627 4,160 - - - - - - - - $627
4,160
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$188
Cost:
-
$188 1,248 - - - - - - - - $188
1,248
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$110
Cost:
-
$110 728 - - - - - - - - $110
728
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$444
Cost:
-
$444 2,943 - - - - - - - - $444
2,943
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$203
Cost:
-
$203 1,345 - - - - - - - - $203
1,345
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
09: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$68
Cost:
-
$68 451 - - - - - - - - $68
451
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
10: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$23
Cost:
-
$23 152 - - - - - - - - $23
152
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
11: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$241
Cost:
-
- - - - - - $241 - - - -
-
kWh
-
-
MMBtu
-
-
$
$241
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$54,260
Cost:
-
$1,663 11,027 $745 53 $20,102 - $29,494 - $2,256 - $1,663
11,027
kWh
$745
53
MMBtu
$20,102
-
$
$29,494
-
$
$2,256
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ $ $ $ $ Tgal
Electricity Usage Fuel Oil #1 Personnel Changes Administrative Changes Water Consumption Electricity Usage Fuel Oil #1 Personnel Changes Administrative Changes Water Consumption