IAC logo
IAC Assessment: LS0012
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LS0012
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2017
Principal Product Ground Coffee
NAICS 311920 - Coffee and Tea Manufacturing
SIC 2095 - Roasted Coffee
Sales $100,000,000-$500,000,000
# of Employees 400
Plant Area (Sq.Ft.) 503,700
Annual Production 41,000 Units
Production Hrs. Annual 8,760
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,121,771 16,083,000 kWh $0.07
Electricity Demand $228,032 29,372 kW-months/year $7.76
Natural Gas $945,988 256,365 MMBtu $3.69
TOTAL ENERGY COSTS $2,295,791
RECOMMENDED SAVINGS* $85,612 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$28,766
Cost:
$12,000
- - $28,766 7,796 -
-
kWh
$28,766
7,796
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,205
Cost:
$920
$2,205 31,608 - - $2,205
31,608
kWh
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$993
Cost:
$548
- - $993 269 -
-
kWh
$993
269
MMBtu
04: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS Savings:
$21,748
Cost:
$15,200
$21,748 311,801 - - $21,748
311,801
kWh
-
-
MMBtu
05: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$3,685
Cost:
$4,250
- - $3,685 999 -
-
kWh
$3,685
999
MMBtu
06: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$28,215
Cost:
$80,000
$28,215 404,804 - - $28,215
404,804
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$85,612
Cost:
$112,918
$52,168 748,213 $33,444 9,064 $52,168
748,213
kWh
$33,444
9,064
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas