IAC logo
IAC Assessment: LS1802
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LS1802
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2018
Principal Product Ship Repairing
NAICS 336611 - Ship Building and Repairing
SIC 3731 - Ship Building And Repairing
Sales $1,000,000-$5,000,000
# of Employees 39
Plant Area (Sq.Ft.) 540,000
Annual Production 1,000,000 Units
Production Hrs. Annual 4,420
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $89,173 1,027,293 kWh $0.09
Electricity Demand $10,994 3,199 kW-months/year $3.44
TOTAL ENERGY COSTS $100,167
RECOMMENDED SAVINGS* $6,431 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,265
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Electricity Usage Personnel Changes
$ kWh $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$379
Cost:
-
$379 4,368 - - $379
4,368
kWh
-
-
$
02: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$1,300
Cost:
$200
- - $1,300 - -
-
kWh
$1,300
-
$
03: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS Savings:
$4,166
Cost:
$2,667
$4,166 47,989 - - $4,166
47,989
kWh
-
-
$
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$427
Cost:
$400
$427 4,921 - - $427
4,921
kWh
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$159
Cost:
$550
$159 1,827 - - $159
1,827
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$6,431
Cost:
$3,817
$5,131 59,105 $1,300 - $5,131
59,105
kWh
$1,300
-
$
TOTAL IMPLEMENTED Savings:
$2,265
Cost:
$1,150
$965 11,116 $1,300 - $965
11,116
kWh
$1,300
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Personnel Changes Electricity Usage Personnel Changes