IAC Assessment: LS2215
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2022
Principal Product Bread
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 68,000
Annual Production 70,000,000 Pounds
Production Hrs. Annual 5,720
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $228,542 3,220,411 kWh $0.07
Electricity Demand $68,163 6,412 kW-months/year $10.63
Natural Gas $118,097 24,088 MMBtu $4.90
TOTAL ENERGY COSTS $414,802
RECOMMENDED SAVINGS* $190,762 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $184,072
#|Description Savings
Cost
Status Electricity Usage Natural Gas Primary Product Electricity Usage Natural Gas Primary Product
$ kWh $ MMBtu $ $
01: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$50,000
Cost:
-
- - - - $50,000 - -
-
kWh
-
-
MMBtu
$50,000
-
$
02: 4.132 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$9,603
Cost:
$1,118
$(-322) (-4,533) - - $9,925 - $(-322)
(-4,533)
kWh
-
-
MMBtu
$9,925
-
$
03: 4.642 INSTALL SENSORS TO DETECT AND AVOID JAMS Savings:
$72,450
Cost:
$2,400
- - - - $72,450 - -
-
kWh
-
-
MMBtu
$72,450
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$631
Cost:
$75
$631 8,890 - - - - $631
8,890
kWh
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,461
Cost:
$270
$1,461 20,580 - - - - $1,461
20,580
kWh
-
-
MMBtu
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$247
Cost:
$100
$247 3,447 - - - - $247
3,447
kWh
-
-
MMBtu
-
-
$
07: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS Savings:
$49,680
Cost:
$58,020
- - - - $49,680 - -
-
kWh
-
-
MMBtu
$49,680
-
$
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$6,502
Cost:
$14,000
- - $6,502 1,326 - - -
-
kWh
$6,502
1,326
MMBtu
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$188
Cost:
$415
$188 2,652 - - - - $188
2,652
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$190,762
Cost:
$76,398
$2,205 31,036 $6,502 1,326 $182,055 - $2,205
31,036
kWh
$6,502
1,326
MMBtu
$182,055
-
$
TOTAL IMPLEMENTED Savings:
$184,072
Cost:
$61,983
$2,017 28,384 - - $182,055 - $2,017
28,384
kWh
-
-
MMBtu
$182,055
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Primary Product Electricity Usage Natural Gas Primary Product