Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Louisiana State University |
---|---|
Assessment Year | 2022 |
Principal Product | Bread |
NAICS | 311812 - Commercial Bakeries |
SIC | 2051 - Bread, Cake, And Related Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 68,000 |
Annual Production | 70,000,000 Pounds |
Production Hrs. Annual | 5,720 |
Location (State) | LA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $228,542 | 3,220,411 | kWh | $0.07 |
Electricity Demand | $68,163 | 6,412 | kW-months/year | $10.63 |
Natural Gas | $118,097 | 24,088 | MMBtu | $4.90 |
TOTAL ENERGY COSTS | $414,802 | |||
RECOMMENDED SAVINGS* | $190,762 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $184,072 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Primary Product | Electricity Usage | Natural Gas | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT |
Savings: $50,000 Cost: - |
- | - | - | - | $50,000 | - |
- - kWh |
- - MMBtu |
$50,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.132 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST |
Savings: $9,603 Cost: $1,118 |
$(-322) | (-4,533) | - | - | $9,925 | - |
$(-322) (-4,533) kWh |
- - MMBtu |
$9,925 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.642 INSTALL SENSORS TO DETECT AND AVOID JAMS |
Savings: $72,450 Cost: $2,400 |
- | - | - | - | $72,450 | - |
- - kWh |
- - MMBtu |
$72,450 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $631 Cost: $75 |
$631 | 8,890 | - | - | - | - |
$631 8,890 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,461 Cost: $270 |
$1,461 | 20,580 | - | - | - | - |
$1,461 20,580 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $247 Cost: $100 |
$247 | 3,447 | - | - | - | - |
$247 3,447 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS |
Savings: $49,680 Cost: $58,020 |
- | - | - | - | $49,680 | - |
- - kWh |
- - MMBtu |
$49,680 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $6,502 Cost: $14,000 |
- | - | $6,502 | 1,326 | - | - |
- - kWh |
$6,502 1,326 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $188 Cost: $415 |
$188 | 2,652 | - | - | - | - |
$188 2,652 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $190,762 Cost: $76,398 |
$2,205 | 31,036 | $6,502 | 1,326 | $182,055 | - | $2,205 31,036 kWh |
$6,502 1,326 MMBtu |
$182,055 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $184,072 Cost: $61,983 |
$2,017 | 28,384 | - | - | $182,055 | - | $2,017 28,384 kWh |
- - MMBtu |
$182,055 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Primary Product | Electricity Usage | Natural Gas | Primary Product |