IAC logo
IAC Assessment: LS2401
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LS2401
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2024
Principal Product Fresh Or Frozen Prepared Fish
NAICS 311710 - Seafood Product Preparation and Packaging
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 1,256,825
Annual Production 600,000,000 Pieces
Production Hrs. Annual 2,304
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,279,655 11,683,000 kWh $0.11
Natural Gas $2,002,250 362,553 MMBtu $5.52
TOTAL ENERGY COSTS $3,281,905
RECOMMENDED SAVINGS* $467,664 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $467,664
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,640
Cost:
$180
$3,640 33,093 - - $3,640
33,093
kWh
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,761
Cost:
$100
$1,761 16,006 - - $1,761
16,006
kWh
-
-
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,301
Cost:
$100
$1,301 11,830 - - $1,301
11,830
kWh
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$370
Cost:
$75
$370 3,362 - - $370
3,362
kWh
-
-
MMBtu
05: 2.9121 INSTALL WIND POWERED ELECTRIC GENERATOR Savings:
$452,959
Cost:
$1,680,000
$452,959 4,117,813 - - $452,959
4,117,813
kWh
-
-
MMBtu
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$7,633
Cost:
$42,000
- - $7,633 1,382 -
-
kWh
$7,633
1,382
MMBtu
TOTAL RECOMMENDED Savings:
$467,664
Cost:
$1,722,455
$460,031 4,182,104 $7,633 1,382 $460,031
4,182,104
kWh
$7,633
1,382
MMBtu
TOTAL IMPLEMENTED Savings:
$467,664
Cost:
$1,722,455
$460,031 4,182,104 $7,633 1,382 $460,031
4,182,104
kWh
$7,633
1,382
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas