Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Louisiana State University |
---|---|
Assessment Year | 2024 |
Principal Product | Fresh Or Frozen Prepared Fish |
NAICS | 311710 - Seafood Product Preparation and Packaging |
SIC | 2092 - Fresh Or Frozen Prepared Fish |
Sales | $50,000,000-$100,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 1,256,825 |
Annual Production | 600,000,000 Pieces |
Production Hrs. Annual | 2,304 |
Location (State) | LA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,279,655 | 11,683,000 | kWh | $0.11 |
Natural Gas | $2,002,250 | 362,553 | MMBtu | $5.52 |
TOTAL ENERGY COSTS | $3,281,905 | |||
RECOMMENDED SAVINGS* | $467,664 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $467,664 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,640 Cost: $180 |
$3,640 | 33,093 | - | - |
$3,640 33,093 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,761 Cost: $100 |
$1,761 | 16,006 | - | - |
$1,761 16,006 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $1,301 Cost: $100 |
$1,301 | 11,830 | - | - |
$1,301 11,830 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $370 Cost: $75 |
$370 | 3,362 | - | - |
$370 3,362 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.9121 INSTALL WIND POWERED ELECTRIC GENERATOR |
Savings: $452,959 Cost: $1,680,000 |
$452,959 | 4,117,813 | - | - |
$452,959 4,117,813 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $7,633 Cost: $42,000 |
- | - | $7,633 | 1,382 |
- - kWh |
$7,633 1,382 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $467,664 Cost: $1,722,455 |
$460,031 | 4,182,104 | $7,633 | 1,382 | $460,031 4,182,104 kWh |
$7,633 1,382 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $467,664 Cost: $1,722,455 |
$460,031 | 4,182,104 | $7,633 | 1,382 | $460,031 4,182,104 kWh |
$7,633 1,382 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||